3751 W 49th Avenue, Vancouver: 2-Storey Transit Facility

2-Storey Transit Facility at 3751 W 49th Avenue, Vancouver was permitted on March 6, 2025 with a stated construction value of $1M to $5M. High Density Housing / Commercial - New Building - To construct a new public wastewater utility pump station, including an above-ground, 2-storey building, below-ground valve chamber, wet well, piping, and piling work on this site. VBBL 2019. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 3751 W 49th Avenue, Vancouver |
| Project | 2-Storey Transit Facility |
| Building type | Commercial |
| Work | New building |
| Permit issued | March 6, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Mechanical |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “High Density Housing / Commercial - New Building - To construct a new public wastewater utility pump station, including an above-ground, 2-storey building, below-ground valve chamber, wet well, piping, and piling work on this site. VBBL 2019”
Which trades are being bought now
The project is with the mechanical, electrical and plumbing rough-in under way. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Vancouver
- 2277 E 19th Avenue: 2-Storey Apartment Building
- 4555 Heather Street: Healthcare Building Renovation
- 888 Pacific Street: Apartment Building Renovation
- 5974 Argyle Street: 3-Storey Apartment Building
- 198 W Hastings Street: Office and Tenant Fit-Out
All of them: construction projects in Vancouver by address. The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 3751 W 49th Avenue?
2-Storey Transit Facility. High Density Housing / Commercial - New Building - To construct a new public wastewater utility pump station, including an above-ground, 2-storey building, below-ground valve chamber, wet well, piping, and piling work on this site. VBBL 2019
When was the permit issued for 3751 W 49th Avenue?
March 6, 2025, by the City of Vancouver.
Who is building 3751 W 49th Avenue?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 3751 W 49th Avenue need now?
At its current stage: site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
