3920 W 29th Avenue, Vancouver: 2-Storey Apartment Building

2-Storey Apartment Building at 3920 W 29th Avenue, Vancouver was permitted on October 15, 2025 with a stated construction value of $1M to $5M. Low Density Housing - New Building - To construct a Multiple Dwelling "Multiplex" with a three-storey plus roof deck two-unit front building with four surface parking spaces having vehicular access from the lane. 1. No external mechanical equipment proposed.… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 3920 W 29th Avenue, Vancouver |
| Project | 2-Storey Apartment Building |
| Building type | Residential |
| Work | New building |
| Permit issued | October 15, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | C-Val Ltd |
| Decision makers and contacts | In Builtie |
From the permit: “Low Density Housing - New Building - To construct a Multiple Dwelling "Multiplex" with a three-storey plus roof deck two-unit front building with four surface parking spaces having vehicular access from the lane. 1. No external mechanical equipment proposed.…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Vancouver
- 1021 W Hastings Street: Office and Tenant Fit-Out
- 1045 Robson Street: Office and Tenant Fit-Out
- 1278 E 63rd Avenue: Apartment Building
- 1308 Adanac Street: Office and Tenant Fit-Out
- 1376 E 62nd Avenue: 3-Storey Apartment Building
All of them: construction projects in Vancouver by address. The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 3920 W 29th Avenue?
2-Storey Apartment Building. Low Density Housing - New Building - To construct a Multiple Dwelling "Multiplex" with a three-storey plus roof deck two-unit front building with four surface parking spaces having vehicular access from the lane. 1. No external mechanical equipment proposed.…
When was the permit issued for 3920 W 29th Avenue?
October 15, 2025, by the City of Vancouver.
Who is building 3920 W 29th Avenue?
C-Val Ltd is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 3920 W 29th Avenue need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
