Apartment Building Renovation at 40 Scollard St, Toronto was permitted on July 15, 2026 with a stated construction value of under $1M. Localised repair of hydro vaults. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address40 Scollard St, Toronto
ProjectApartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedJuly 15, 2026
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Localised repair of hydro vaults”

Where this project is

  1. Since April 20024 other permits at this address
  2. April 19, 2002Addition or alteration: interior alteration · under $1M
  3. June 13, 2011Addition or alteration: interior alteration · under $1M
  4. March 28, 2013Addition or alteration: interior alteration · under $1M
  5. February 11, 2020Addition or alteration · under $1M
  6. October 5, 2023Plumbing
  7. July 15, 2026Addition or alteration: Apartment Building Renovation · under $1M (this page)
  8. August 2026Estimated construction start (estimate)
  9. February 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 4 more renovations within 1 km

  • 717 Church StNew building · $100M to $250M · March 2026
  • 900 Bay StAddition or alteration: interior alteration · $25M to $50M · April 2026
  • 61 Yorkville AveAddition or alteration: interior alteration · $5M to $10M · November 2025
  • 120 Bloor St EAddition or alteration: interior alteration · $1M to $5M · December 2025
  • 252 Bloor St WAddition or alteration: interior alteration · $1M to $5M · February 2026

26 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 2 to approach now, 8 passed.

TradeWhen to approach (est.)Status
Construction (est.)Aug 2026 – Feb 2027Estimate
Construction Site SecurityJul 2026 – Sep 2026Window passed (est.)
Concrete and FoundationAug 2026Window passed (est.)
Structural SteelAug 2026 – Sep 2026Window passed (est.)
ElevatorsAug 2026 – Sep 2026Window passed (est.)
FramingAug 2026 – Sep 2026Window passed (est.)
PaintingAug 2026 – Oct 2026Approach now
MasonryAug 2026 – Sep 2026Window passed (est.)
WaterproofingAug 2026 – Sep 2026Window passed (est.)
RoofingSep 2026 – Oct 2026Approach now
Windows, Doors and GlazingAug 2026 – Sep 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 40 Scollard St?

Apartment Building Renovation. Localised repair of hydro vaults

When was the permit issued for 40 Scollard St?

July 15, 2026, by the City of Toronto.

Who is building 40 Scollard St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 40 Scollard St need now?

Estimated as of October 2026, the trades to approach now are painting and roofing. Already passed: site security; concrete; structural steel; elevator; framing; masonry; waterproofing; window, door and glazing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.