4001 Leslie St, Toronto: Healthcare Building Renovation

Healthcare Building Renovation at 4001 Leslie St, Toronto was permitted on June 18, 2025 with a stated construction value of under $1M. Proposal to restore garage (concrete repairs, waterproofing, localized repairs). Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 4001 Leslie St, Toronto |
| Neighbourhood | Bayview Village |
| Project | Healthcare Building Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | June 18, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal to restore garage (concrete repairs, waterproofing, localized repairs)”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since March 199771 other permits at this address
- September 19, 2019Addition or alteration: interior alteration · under $1M
- October 11, 2024Addition or alteration: interior alteration · $10M to $25M
- February 6, 2025Fire and life safety: fire protection · under $1M
- March 5, 2025Fire and life safety · under $1M
- June 11, 2025Addition or alteration: plumbing · under $1M
- June 18, 2025Addition or alteration: Healthcare Building Renovation · under $1M (this page)
- July 2025Estimated construction start (estimate)
- January 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 180 Duncan Mill RdAddition or alteration: interior alteration · $1M to $5M · September 2026
1 project of $1M+ was permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2025 – Jan 2026 | Estimate |
| Fire Protection | Aug 2025 – Sep 2025 | Window passed (est.) |
| Signage and Wayfinding | Sep 2025 – Nov 2025 | Window passed (est.) |
| Insulation | Aug 2025 – Sep 2025 | Window passed (est.) |
| Drywall | Sep 2025 – Oct 2025 | Window passed (est.) |
| Low Voltage and Data | Sep 2025 – Oct 2025 | Window passed (est.) |
| Tile | Sep 2025 – Oct 2025 | Window passed (est.) |
| Cabinetry and Millwork | Sep 2025 – Oct 2025 | Window passed (est.) |
| Flooring | Sep 2025 – Oct 2025 | Window passed (est.) |
| Countertops | Sep 2025 – Oct 2025 | Window passed (est.) |
| Finish Carpentry | Sep 2025 – Oct 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2025) to the estimated completion (January 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 15 Provost Dr: Retail Building Renovation
- 2911 Bayview Ave: Apartment Building Renovation
- 650 Sheppard Ave E: Healthcare Building Renovation
- 44 Appian Dr: 2-Storey School Renovation
- 1897 Eglinton Ave E: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 4001 Leslie St?
Healthcare Building Renovation. Proposal to restore garage (concrete repairs, waterproofing, localized repairs)
When was the permit issued for 4001 Leslie St?
June 18, 2025, by the City of Toronto.
Who is building 4001 Leslie St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 4001 Leslie St need now?