2911 Bayview Ave, Toronto: Apartment Building Renovation

Apartment Building Renovation at 2911 Bayview Ave, Toronto was permitted on April 10, 2025 with a stated construction value of under $1M. Podium deck breezeway waterproofing replacement, localized concrete repairs, and drain replacement. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2911 Bayview Ave, Toronto |
| Neighbourhood | Bayview Village |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | April 10, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Mechanical |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Podium deck breezeway waterproofing replacement, localized concrete repairs, and drain replacement”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- February 26, 2019Addition or alteration
- April 10, 2025Addition or alteration: Apartment Building Renovation · under $1M (this page)
- June 22, 2026Addition or alteration · under $1M
- May 2025Estimated construction start (estimate)
- November 2025Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 2901 Bayview AveNew building · $50M to $100M · July 2026
- 2810 Bayview AveMechanical · $1M to $5M · March 2026
5 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | May 2025 – Nov 2025 | Estimate |
| Construction Site Security | Apr 2025 – Jun 2025 | Window passed (est.) |
| Painting | May 2025 – Jul 2025 | Window passed (est.) |
| Electrical | Jun 2025 – Jul 2025 | Window passed (est.) |
| HVAC and Mechanical | Jun 2025 – Jul 2025 | Window passed (est.) |
| Plumbing | May 2025 – Jul 2025 | Window passed (est.) |
| Fire Protection | Jun 2025 – Jul 2025 | Window passed (est.) |
| Signage and Wayfinding | Jul 2025 – Sep 2025 | Window passed (est.) |
| Insulation | Jun 2025 – Jul 2025 | Window passed (est.) |
| Drywall | Jun 2025 – Aug 2025 | Window passed (est.) |
| Low Voltage and Data | Jun 2025 – Aug 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (May 2025) to the estimated completion (November 2025) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 4001 Leslie St: Healthcare Building Renovation
- 15 Provost Dr: Retail Building Renovation
- 650 Sheppard Ave E: Healthcare Building Renovation
- 44 Appian Dr: 2-Storey School Renovation
- 150 Sherbourne St: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2911 Bayview Ave?
Apartment Building Renovation. Podium deck breezeway waterproofing replacement, localized concrete repairs, and drain replacement
When was the permit issued for 2911 Bayview Ave?
April 10, 2025, by the City of Toronto.
Who is building 2911 Bayview Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2911 Bayview Ave need now?
Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
