150 Sherbourne St, Toronto: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 150 Sherbourne St, Toronto was permitted on May 26, 2025 with a stated construction value of under $1M. Proposal for Temporary Site Office. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address150 Sherbourne St, Toronto
NeighbourhoodMoss Park
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkNew building
Permit issuedMay 26, 2025
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitCity of Toronto
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for Temporary Site Office”

Where this project is

  1. Since March 20051 other permit at this address
  2. March 2, 2005Mechanical
  3. May 26, 2025New construction: Office and Tenant Fit-Out · under $1M (this page)
  4. June 18, 2025Plumbing
  5. July 9, 2025Mechanical
  6. February 2, 2026Conditional Permit
  7. February 2, 2026Plumbing
  8. June 2025Estimated construction start (estimate)
  9. December 2025Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 8 Elm StNew building · over $250M · March 2026
  • 285 Queen St EConditional Permit · $100M to $250M · May 2026
  • 325 Gerrard St EAddition or alteration: excavation and shoring · $100M to $250M · November 2025
  • 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
  • 227 Gerrard St ENew building · $25M to $50M · October 2025

42 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

City of Toronto has 29 other projects in Builtie

  • Toronto · Addition or alteration: plumbing · $25M to $50M · 2024
  • Toronto · New building · $10M to $25M · 1996
  • Toronto · Addition or alteration: roofing · $1M to $5M · 2004

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jun 2025 – Dec 2025Estimate
Fire ProtectionJul 2025 – Aug 2025Window passed (est.)
Signage and WayfindingSep 2025 – Oct 2025Window passed (est.)
InsulationAug 2025 – Sep 2025Window passed (est.)
DrywallAug 2025 – Sep 2025Window passed (est.)
Low Voltage and DataAug 2025 – Sep 2025Window passed (est.)
TileAug 2025 – Sep 2025Window passed (est.)
Cabinetry and MillworkAug 2025 – Sep 2025Window passed (est.)
FlooringAug 2025 – Sep 2025Window passed (est.)
CountertopsAug 2025 – Sep 2025Window passed (est.)
Finish CarpentryAug 2025 – Sep 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (June 2025) to the estimated completion (December 2025) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 150 Sherbourne St?

Office and Tenant Fit-Out. Proposal for Temporary Site Office

When was the permit issued for 150 Sherbourne St?

May 26, 2025, by the City of Toronto.

Who is building 150 Sherbourne St?

City of Toronto is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 150 Sherbourne St need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.