91 Pembroke St, Toronto: Residential Project Renovation

Residential Project Renovation at 91 Pembroke St, Toronto was permitted on May 28, 2026 with a stated construction value of under $1M. Proposal to renovate existing rooms, provide central HVAC system and new washrooms. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 91 Pembroke St, Toronto |
| Neighbourhood | Moss Park |
| Project | Residential Project Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | May 28, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal to renovate existing rooms, provide central HVAC system and new washrooms”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- May 28, 2026Small Residential Projects: Residential Project Renovation · under $1M (this page)
- May 28, 2026Plumbing
- May 28, 2026Mechanical
- June 2026Estimated construction start (estimate)
- December 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 8 Elm StNew building · over $250M · March 2026
- 285 Queen St EConditional Permit · $100M to $250M · May 2026
- 325 Gerrard St EAddition or alteration: excavation and shoring · $100M to $250M · November 2025
- 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
- 227 Gerrard St ENew building · $25M to $50M · October 2025
25 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2026 – Dec 2026 | Estimate |
| Construction Site Security | Jun 2026 – Jul 2026 | Window passed (est.) |
| Concrete and Foundation | Jun 2026 – Jul 2026 | Window passed (est.) |
| Structural Steel | Jun 2026 – Jul 2026 | Window passed (est.) |
| Elevators | Jun 2026 – Aug 2026 | Window passed (est.) |
| Framing | Jun 2026 – Aug 2026 | Window passed (est.) |
| Painting | Jul 2026 – Aug 2026 | Window passed (est.) |
| Masonry | Jun 2026 – Jul 2026 | Window passed (est.) |
| Waterproofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Roofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jul 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 14 Eastern Ave: Office and Tenant Fit-Out
- 150 Sherbourne St: Office and Tenant Fit-Out
- 209 Carlton St: Affordable Housing Renovation
- 87 Pembroke St: Residential Project Renovation
- 311 Sherbourne St: Hotel Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 91 Pembroke St?
Residential Project Renovation. Proposal to renovate existing rooms, provide central HVAC system and new washrooms
When was the permit issued for 91 Pembroke St?
May 28, 2026, by the City of Toronto.
Who is building 91 Pembroke St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 91 Pembroke St need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
