4012 C Hillsboro Pike, Nashville: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 4012 C Hillsboro Pike, Nashville was permitted on October 8, 2026 with a stated construction value of $1M to $5M. Interior demolition and rehab along with new windows/doors and roof to white box Building C to ready for future tenant improvements and establish future uses under separate/future permits. No exterior work to Building C or expansion of building footprint.… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 4012 C Hillsboro Pike, Nashville |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | October 8, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Interior demolition and rehab along with new windows/doors and roof to white box Building C to ready for future tenant improvements and establish future uses under separate/future permits. No exterior work to Building C or expansion of building footprint.…”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 3917 Gallatin Pike: Restaurant
- 4026 Lebanon Pike: Office and Tenant Fit-Out
- 111 4th Ave S: Restaurant Renovation
- 1220 Martin St: Office and Tenant Fit-Out
- 1402 Dickerson Pike: Commercial Project Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 4012 C Hillsboro Pike?
Office and Tenant Fit-Out. Interior demolition and rehab along with new windows/doors and roof to white box Building C to ready for future tenant improvements and establish future uses under separate/future permits. No exterior work to Building C or expansion of building footprint.…
When was the permit issued for 4012 C Hillsboro Pike?
October 8, 2026, by Metro Nashville and Davidson County.
Who is building 4012 C Hillsboro Pike?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 4012 C Hillsboro Pike need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
