407 Arlington Ave, Toronto: 3-Storey Retail Building

3-Storey Retail Building at 407 Arlington Ave, Toronto was permitted on February 7, 2025 with a stated construction value of under $1M. Propose new 3-storey fourplex. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 407 Arlington Ave, Toronto |
| Neighbourhood | Humewood-Cedarvale |
| Project | 3-Storey Retail Building |
| Building type | Residential |
| Work | New building |
| Permit issued | February 7, 2025 |
| Housing units | 3 |
| Stated construction value | under $1M |
| Estimated stage | Mechanical |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Propose new 3-storey fourplex”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since February 20253 other permits at this address
- February 7, 2025New construction: 3-Storey Retail Building · under $1M (this page)
- February 7, 2025Drains and site services
- February 7, 2025Plumbing
- February 10, 2025Demolition
- May 12, 2025Small Residential Projects · under $1M
- May 12, 2025Drains and site services
- March 2025Estimated construction start (estimate)
- September 2025Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 341 Oakwood AveAddition or alteration: interior alteration · $1M to $5M · June 2026
- 560 Atlas AveNew construction: demolition · $1M to $5M · May 2026
- 113 Alameda AveNew building · $1M to $5M · January 2026
10 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Mar 2025 – Sep 2025 | Estimate |
| Construction Site Security | Feb 2025 – Apr 2025 | Window passed (est.) |
| Painting | Mar 2025 – May 2025 | Window passed (est.) |
| Electrical | Apr 2025 – May 2025 | Window passed (est.) |
| HVAC and Mechanical | Apr 2025 – May 2025 | Window passed (est.) |
| Plumbing | Mar 2025 – May 2025 | Window passed (est.) |
| Fire Protection | Apr 2025 – May 2025 | Window passed (est.) |
| Signage and Wayfinding | May 2025 – Jul 2025 | Window passed (est.) |
| Insulation | Apr 2025 – May 2025 | Window passed (est.) |
| Drywall | Apr 2025 – May 2025 | Window passed (est.) |
| Low Voltage and Data | Apr 2025 – May 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (March 2025) to the estimated completion (September 2025) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 99 Vaughan Rd: Apartment Building Renovation
- 15 Cherrywood Ave: School Renovation
- 1560 Bathurst St: Apartment Building Renovation
- 1950 Bathurst St: Place of Worship Renovation
- 42 Centre St: 3-Storey Retail Building
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 407 Arlington Ave?
3-Storey Retail Building. Propose new 3-storey fourplex
When was the permit issued for 407 Arlington Ave?
February 7, 2025, by the City of Toronto.
Who is building 407 Arlington Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 407 Arlington Ave need now?
Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.