410 Queens Quay, Toronto: Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

Apartment Building Renovation at 410 Queens Quay, Toronto was permitted on June 3, 2025 with a stated construction value of under $1M. Proposal for removing slab edge covers, repairing balcony slab edges and applying coating to slab edge. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address410 Queens Quay, Toronto
NeighbourhoodHarbourfront-CityPlace
ProjectApartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedJune 3, 2025
Stated construction valueunder $1M
Estimated stageLikely complete
Company named on the permitMonarch Construction
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for removing slab edge covers, repairing balcony slab edges and applying coating to slab edge”

Where this project is

  1. April 14, 2023Mechanical
  2. January 20, 2025Addition or alteration
  3. June 3, 2025Addition or alteration: Apartment Building Renovation · under $1M (this page)
  4. June 2025Estimated construction start (estimate)
  5. January 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby: 5 more renovations within 1 km

  • 462 Wellington St WAddition or alteration: structural work · $50M to $100M · November 2025
  • 230 Front St WAddition or alteration: interior alteration · $25M to $50M · June 2026
  • 530 Front St WAddition or alteration: fire protection · $25M to $50M · July 2026
  • 120 Bremner BlvdAddition or alteration: interior alteration · $10M to $25M · July 2026
  • 250 Front St WAddition or alteration: interior alteration · $5M to $10M · October 2025

11 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 410 Queens Quay?

Apartment Building Renovation. Proposal for removing slab edge covers, repairing balcony slab edges and applying coating to slab edge

When was the permit issued for 410 Queens Quay?

June 3, 2025, by the City of Toronto.

Who is building 410 Queens Quay?

Monarch Construction is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 410 Queens Quay need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.