350 Queens Quay, Toronto: Hotel Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Hotel Renovation at 350 Queens Quay, Toronto was permitted on April 28, 2025 with a stated construction value of under $1M. Interior renovation work to construct 11 hotel suites with individual washrooms and kitchenettes on the 2nd floor. Interior renovation work to the ground floor includes a hotel entrance lobby and service rooms. Construction of a new elevator from ground floor… Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address350 Queens Quay, Toronto
NeighbourhoodHarbourfront-CityPlace
ProjectHotel Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedApril 28, 2025
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitMultiplex
Decision makers and contactsSee who to contact — free trial

From the permit: “Interior renovation work to construct 11 hotel suites with individual washrooms and kitchenettes on the 2nd floor. Interior renovation work to the ground floor includes a hotel entrance lobby and service rooms. Construction of a new elevator from ground floor…”

Where this project is

  1. Since May 202111 other permits at this address
  2. May 10, 2021Drains and site services · $5M to $10M
  3. April 25, 2025Addition or alteration: interior alteration · under $1M
  4. April 28, 2025Addition or alteration: Hotel Renovation · under $1M (this page)
  5. January 26, 2026Addition or alteration: interior alteration · under $1M
  6. June 4, 2026Addition or alteration · under $1M
  7. June 4, 2026Plumbing
  8. May 2025Estimated construction start (estimate)
  9. November 2025Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 462 Wellington St WAddition or alteration: structural work · $50M to $100M · November 2025
  • 230 Front St WAddition or alteration: interior alteration · $25M to $50M · June 2026
  • 530 Front St WAddition or alteration: fire protection · $25M to $50M · July 2026
  • 25 York StAddition or alteration: electrical · $10M to $25M · January 2026
  • 120 Bremner BlvdAddition or alteration: interior alteration · $10M to $25M · July 2026

17 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)May 2025 – Nov 2025Estimate
Fire ProtectionJun 2025 – Jul 2025Window passed (est.)
Signage and WayfindingAug 2025 – Sep 2025Window passed (est.)
InsulationJul 2025 – Aug 2025Window passed (est.)
DrywallJul 2025 – Aug 2025Window passed (est.)
Low Voltage and DataJul 2025 – Aug 2025Window passed (est.)
TileJul 2025 – Aug 2025Window passed (est.)
Cabinetry and MillworkJul 2025 – Aug 2025Window passed (est.)
FlooringJul 2025 – Aug 2025Window passed (est.)
CountertopsJul 2025 – Aug 2025Window passed (est.)
Finish CarpentryJul 2025 – Aug 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (May 2025) to the estimated completion (November 2025) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 350 Queens Quay?

Hotel Renovation. Interior renovation work to construct 11 hotel suites with individual washrooms and kitchenettes on the 2nd floor. Interior renovation work to the ground floor includes a hotel entrance lobby and service rooms. Construction of a new elevator from ground floor…

When was the permit issued for 350 Queens Quay?

April 28, 2025, by the City of Toronto.

Who is building 350 Queens Quay?

Multiplex is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 350 Queens Quay need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.