4100 77 St, Red Deer: Industrial Building

Industrial Building at 4100 77 St, Red Deer was permitted on July 21, 2025. COM-NEW-FULL - Accessory Steel Building to expand the Tornado Global Hydrovac Equipment assembly line. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 4100 77 St, Red Deer |
| Project | Industrial Building |
| Building type | Industrial |
| Work | New building |
| Permit issued | July 21, 2025 |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “COM-NEW-FULL - Accessory Steel Building to expand the Tornado Global Hydrovac Equipment assembly line”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Red Deer
- 6321 50 Av: Retail Building Renovation
- 2000 4750 54 Av: Apartment Building
- 3733 45 St: Townhomes
- 105 2004 50 Av: Retail Building Renovation
- 3101 2827 30 Av: Retail Building
All of them: construction projects in Red Deer by address. The data is Red Deer's own building permits. Neighbouring cities issue their own permits and are not in this count. It is a small feed, so a trade's count can change quickly.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 4100 77 St?
Industrial Building. COM-NEW-FULL - Accessory Steel Building to expand the Tornado Global Hydrovac Equipment assembly line
When was the permit issued for 4100 77 St?
July 21, 2025, by the City of Red Deer.
Who is building 4100 77 St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 4100 77 St need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
