4146 120 Av SE, Calgary: Warehouse

Warehouse at 4146 120 Av SE, Calgary was permitted on September 4, 2026 with a stated construction value of $1M to $5M. Consolidated Gypsum Cold Storage Facility. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 4146 120 Av SE, Calgary |
| Project | Warehouse |
| Building type | Commercial |
| Work | New building |
| Permit issued | September 4, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Consolidated Gypsum Cold Storage Facility”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Calgary
- 2223 81 St SW: Townhomes
- 21359 Nostalgia St SE: 3-Storey Townhomes
- 5555 78 Av SE: Warehouse Renovation
- 3021r 30 Av SW: 3-Storey School
- 5504 Macleod Tr SW: Office and Tenant Fit-Out
All of them: construction projects in Calgary by address. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 4146 120 Av SE?
Warehouse. Consolidated Gypsum Cold Storage Facility
When was the permit issued for 4146 120 Av SE?
September 4, 2026, by the City of Calgary.
Who is building 4146 120 Av SE?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 4146 120 Av SE need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
