439 Sherbourne St, Toronto: Long-Term Care Home Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Long-Term Care Home Renovation at 439 Sherbourne St, Toronto was permitted on November 10, 2025 with a stated construction value of under $1M. Proposal to Reconfigure & upgrade the Ground Floor 1W&1E Serveries with new food service equipment, light fixtures, finishes and improved ventilation and cooling capacity. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address439 Sherbourne St, Toronto
NeighbourhoodCabbagetown-South St.James Town
ProjectLong-Term Care Home Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedNovember 10, 2025
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitDig-Con International Limited
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal to Reconfigure & upgrade the Ground Floor 1W&1E Serveries with new food service equipment, light fixtures, finishes and improved ventilation and cooling capacity”

Where this project is

  1. Since April 200713 other permits at this address
  2. January 26, 2011Addition or alteration: interior alteration · under $1M
  3. May 28, 2015Addition or alteration: interior alteration · under $1M
  4. May 17, 2017Mechanical · under $1M
  5. February 12, 2018Addition or alteration: interior alteration · under $1M
  6. September 29, 2025Addition or alteration: electrical · under $1M
  7. November 10, 2025Addition or alteration: Long-Term Care Home Renovation · under $1M (this page)
  8. December 2025Estimated construction start (estimate)
  9. June 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 4 more renovations within 1 km

  • 325 Gerrard St EAddition or alteration: excavation and shoring · $100M to $250M · November 2025
  • 227 Gerrard St ENew building · $25M to $50M · October 2025
  • 120 Bloor St EAddition or alteration: interior alteration · $1M to $5M · December 2025
  • 130 Carlton StAddition or alteration: roofing · $1M to $5M · April 2026
  • 550 Ontario StAddition or alteration: roofing · $1M to $5M · January 2026

9 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Dig-Con International Limited has 2 other projects in Builtie

  • Toronto · Addition or alteration: interior alteration · under $1M · 2025
  • Toronto · Fire and life safety · under $1M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Dec 2025 – Jun 2026Estimate
Construction Site SecurityNov 2025 – Jan 2026Window passed (est.)
PaintingDec 2025 – Feb 2026Window passed (est.)
MasonryDec 2025 – Jan 2026Window passed (est.)
WaterproofingDec 2025 – Jan 2026Window passed (est.)
RoofingDec 2025 – Feb 2026Window passed (est.)
Windows, Doors and GlazingDec 2025 – Jan 2026Window passed (est.)
ElectricalJan 2026 – Feb 2026Window passed (est.)
HVAC and MechanicalJan 2026 – Feb 2026Window passed (est.)
PlumbingDec 2025 – Feb 2026Window passed (est.)
Fire ProtectionJan 2026 – Feb 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (December 2025) to the estimated completion (June 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 439 Sherbourne St?

Long-Term Care Home Renovation. Proposal to Reconfigure & upgrade the Ground Floor 1W&1E Serveries with new food service equipment, light fixtures, finishes and improved ventilation and cooling capacity

When was the permit issued for 439 Sherbourne St?

November 10, 2025, by the City of Toronto.

Who is building 439 Sherbourne St?

Dig-Con International Limited is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 439 Sherbourne St need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.