4470 Maple Crescent, Vancouver: 3-Storey Apartment Building

3-Storey Apartment Building at 4470 Maple Crescent, Vancouver was permitted on October 13, 2026 with a stated construction value of $1M to $5M. Low Density Housing - New Building - To construct a Multiple Dwelling “Multiplex” with a three-storey plus roof deck two-unit front building, with 2 garage and 2 carport parking spaces at the rear building, having vehicular access from the lane. 1.\tHRV unit… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 4470 Maple Crescent, Vancouver |
| Project | 3-Storey Apartment Building |
| Building type | Residential |
| Work | New building |
| Permit issued | October 13, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Low Density Housing - New Building - To construct a Multiple Dwelling “Multiplex” with a three-storey plus roof deck two-unit front building, with 2 garage and 2 carport parking spaces at the rear building, having vehicular access from the lane. 1.\tHRV unit…”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Vancouver
- 27 E 7th Avenue #100: Apartment Building Renovation
- 1133 Hamilton Street: 4-Storey Apartment Building Renovation
- 1133 Melville Street: Office and Tenant Fit-Out
- 1133 W Hastings Street: Hotel Renovation
- 1238 Le Roi Street: Apartment Building
All of them: construction projects in Vancouver by address. The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 4470 Maple Crescent?
3-Storey Apartment Building. Low Density Housing - New Building - To construct a Multiple Dwelling “Multiplex” with a three-storey plus roof deck two-unit front building, with 2 garage and 2 carport parking spaces at the rear building, having vehicular access from the lane. 1.\tHRV unit…
When was the permit issued for 4470 Maple Crescent?
October 13, 2026, by the City of Vancouver.
Who is building 4470 Maple Crescent?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 4470 Maple Crescent need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
