4580 W Electronics Pl, Los Angeles: Commercial Project Renovation

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Commercial Project Renovation at 4580 W Electronics Pl, Los Angeles was permitted on May 12, 2026 with a stated construction value of under $1M. Interior T.I. for replacement and relocation of engraving, edging, and conveying equipment within the optical laboratory on the first floor of the Regional Service Center (Area of Work: 1,100 SF). Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address4580 W Electronics Pl, Los Angeles
ProjectCommercial Project Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedMay 12, 2026
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitKaiser Foundation Health Plan Inc See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Interior T.I. for replacement and relocation of engraving, edging, and conveying equipment within the optical laboratory on the first floor of the Regional Service Center (Area of Work: 1,100 SF)”

Where this project is

  1. Since April 20253 other permits at this address
  2. May 27, 2025Alteration: structural work · under $1M
  3. February 16, 2026Interior alteration · under $1M
  4. February 25, 2026Alteration: roofing · under $1M
  5. May 5, 2026Alteration: structural work · under $1M
  6. May 12, 2026Alteration: Commercial Project Renovation · under $1M (this page)
  7. May 12, 2026Interior alteration · under $1M
  8. May 2026Estimated construction start (estimate)
  9. December 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

1 project of $1M+ was permitted within 1 km in the last 12 months. See them all in Builtie →

This project   The nearby project, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Kaiser Foundation Health Plan Inc has 14 other projects in Builtie

  • Los Angeles · Alteration · under $1M · 2025
  • Los Angeles · Alteration: elevator · under $1M · 2026
  • Los Angeles · Alteration: structural work · under $1M · 2025

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)May 2026 – Dec 2026Estimate
Construction Site SecurityMay 2026 – Jun 2026Window passed (est.)
PaintingJun 2026 – Aug 2026Window passed (est.)
MasonryMay 2026 – Jun 2026Window passed (est.)
WaterproofingMay 2026 – Jun 2026Window passed (est.)
RoofingJun 2026 – Jul 2026Window passed (est.)
Windows, Doors and GlazingJun 2026 – Jul 2026Window passed (est.)
ElectricalJun 2026 – Aug 2026Window passed (est.)
HVAC and MechanicalJun 2026 – Aug 2026Window passed (est.)
PlumbingJun 2026 – Aug 2026Window passed (est.)
Fire ProtectionJun 2026 – Aug 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Los Angeles

All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 4580 W Electronics Pl?

Commercial Project Renovation. Interior T.I. for replacement and relocation of engraving, edging, and conveying equipment within the optical laboratory on the first floor of the Regional Service Center (Area of Work: 1,100 SF)

When was the permit issued for 4580 W Electronics Pl?

May 12, 2026, by the City of Los Angeles.

Who is building 4580 W Electronics Pl?

Kaiser Foundation Health Plan Inc is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 4580 W Electronics Pl need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.