46 Macdonell Ave, Toronto: 3-Storey Retail Building

3-Storey Retail Building at 46 Macdonell Ave, Toronto was permitted on August 13, 2026 with a stated construction value of under $1M. Construct new 3 storey sixplex. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 46 Macdonell Ave, Toronto |
| Project | 3-Storey Retail Building |
| Building type | Residential |
| Work | New building |
| Permit issued | August 13, 2026 |
| Housing units | 6 |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Construct new 3 storey sixplex”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since August 20263 other permits at this address
- August 13, 2026New construction: 3-Storey Retail Building · under $1M (this page)
- August 13, 2026Demolition
- August 13, 2026Drains and site services: demolition
- August 24, 2026Mechanical: demolition
- September 3, 2026Small Residential Projects · under $1M
- September 3, 2026Drains and site services
- August 2026Estimated construction start (estimate)
- March 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 1521 Queen St WNew building · $25M to $50M · January 2026
- 209 Jameson AveAddition or alteration · $1M to $5M · June 2026
- 1266 Queen St WMechanical · $1M to $5M · February 2026
3 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 6 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Aug 2026 – Mar 2027 | Estimate |
| Excavation and Site Work | Aug 2026 | Window passed (est.) |
| Construction Site Security | Aug 2026 – Sep 2026 | Window passed (est.) |
| Concrete and Foundation | Aug 2026 – Sep 2026 | Window passed (est.) |
| Structural Steel | Aug 2026 – Sep 2026 | Window passed (est.) |
| Elevators | Aug 2026 – Oct 2026 | Approach now |
| Framing | Aug 2026 – Oct 2026 | Approach now |
| Painting | Sep 2026 – Nov 2026 | Approach now |
| Masonry | Aug 2026 – Sep 2026 | Window passed (est.) |
| Waterproofing | Aug 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1876 A Keele St: Residential Project
- 1876 B Keele St: Residential Project
- 120 Town Haven Pl: Apartment Building Renovation
- 277 Victoria St: Residential Project Renovation
- 2902 Dundas St W: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 46 Macdonell Ave?
3-Storey Retail Building. Construct new 3 storey sixplex
When was the permit issued for 46 Macdonell Ave?
August 13, 2026, by the City of Toronto.
Who is building 46 Macdonell Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 46 Macdonell Ave need now?
Estimated as of October 2026, the trades to approach now are elevator, framing and painting. Already passed: excavation and site work; site security; concrete; structural steel; masonry; waterproofing.