4731 Brick Church Pike, Nashville: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 4731 Brick Church Pike, Nashville was permitted on May 20, 2025 with a stated construction value of $1M to $5M. Renovating an existing 5,000 sq ft pole barn and adding an additional 100 sq ft to building footprint. To establish Rehabilitation Services Use to the property, Structural renovation to include new exterior walls and foundation, new interior load-bearing… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 4731 Brick Church Pike, Nashville |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | May 20, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Renovating an existing 5,000 sq ft pole barn and adding an additional 100 sq ft to building footprint. To establish Rehabilitation Services Use to the property, Structural renovation to include new exterior walls and foundation, new interior load-bearing…”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 111 4th Ave S: Restaurant Renovation
- 1220 Martin St: Office and Tenant Fit-Out
- 1402 Dickerson Pike: Commercial Project Renovation
- 2100 Charlotte Ave: Office and Tenant Fit-Out
- 2201 Murphy Ave: Office and Tenant Fit-Out
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 4731 Brick Church Pike?
Office and Tenant Fit-Out. Renovating an existing 5,000 sq ft pole barn and adding an additional 100 sq ft to building footprint. To establish Rehabilitation Services Use to the property, Structural renovation to include new exterior walls and foundation, new interior load-bearing…
When was the permit issued for 4731 Brick Church Pike?
May 20, 2025, by Metro Nashville and Davidson County.
Who is building 4731 Brick Church Pike?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 4731 Brick Church Pike need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
