49 Cardigan Rd, Toronto: Single-Family House

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

Single-Family House at 49 Cardigan Rd, Toronto was permitted on March 13, 2026 with a stated construction value of $1M to $5M. New single-family house. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address49 Cardigan Rd, Toronto
NeighbourhoodStonegate-Queensway
ProjectSingle-Family House
Building typeResidential
WorkNew building
Permit issuedMarch 13, 2026
Housing units1
Stated construction value$1M to $5M
Estimated stageFraming
Company named on the permitNeff Beautiful Living Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. March 13, 2026New construction: Single-Family House · $1M to $5M (this page)
  2. March 13, 2026Demolition
  3. March 13, 2026Plumbing
  4. March 13, 2026Drains and site services
  5. April 2026Estimated construction start (estimate)
  6. April 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 3250 Bloor St WAddition or alteration: interior alteration · $1M to $5M · February 2026
  • 3265 Bloor St WAddition · $1M to $5M · December 2025
  • 48 Gardenvale RdNew construction: demolition · $1M to $5M · April 2026
  • 70 Eagle RdNew building · $1M to $5M · May 2026
  • 48 Thompson AveSmall Residential Projects: addition · $1M to $5M · April 2026

10 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Apr 2026 – Apr 2027Estimate
Construction Site SecurityMar 2026 – Jun 2026Window passed (est.)
PaintingApr 2026 – Aug 2026Window passed (est.)
MasonryApr 2026 – Jun 2026Window passed (est.)
WaterproofingApr 2026 – Jun 2026Window passed (est.)
RoofingMay 2026 – Jul 2026Window passed (est.)
Windows, Doors and GlazingApr 2026 – Jul 2026Window passed (est.)
ElectricalJun 2026 – Aug 2026Window passed (est.)
HVAC and MechanicalJun 2026 – Aug 2026Window passed (est.)
PlumbingMay 2026 – Aug 2026Window passed (est.)
Fire ProtectionJun 2026 – Aug 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (April 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 49 Cardigan Rd?

Single-Family House. New single-family house.

When was the permit issued for 49 Cardigan Rd?

March 13, 2026, by the City of Toronto.

Who is building 49 Cardigan Rd?

Neff Beautiful Living Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 49 Cardigan Rd need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.