49 Ontario St, Toronto: 50-Storey Affordable Housing

Residential development under construction with tower cranes on the skyline
Figures read October 25, 2026 from Builtie's permit data.

50-Storey Affordable Housing at 49 Ontario St, Toronto was permitted on October 14, 2026 with a stated construction value of $25M to $50M. Construction of two buildings of 46 and 50 storeys with underground parking garage (245 affordable housing units) and townhouses. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address49 Ontario St, Toronto
Project50-Storey Affordable Housing
Building typeResidential
WorkNew building
Permit issuedOctober 14, 2026
Housing units1,226
Stated construction value$25M to $50M
Estimated stagePermit
Company named on the permitDream Unlimited Corp. and CentreCourt Developments (joint venture) See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Construction of two buildings of 46 and 50 storeys with underground parking garage (245 affordable housing units) and townhouses”

Where this project is

  1. Since October 20136 other permits at this address
  2. July 8, 2025Demolition
  3. May 6, 2026New building
  4. June 16, 2026Drains and site services
  5. August 12, 2026New building
  6. August 14, 2026Drains and site services · under $1M
  7. October 14, 2026New construction: 50-Storey Affordable Housing · $25M to $50M (this page)
  8. December 2026Estimated construction start (estimate)
  9. April 2029Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 30 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 4 coming up.

TradeWhen to approach (est.)Status
Construction (est.)Dec 2026 – Apr 2029Estimate
Excavation and Site WorkSep 2026 – Dec 2026Approach now
Construction Site SecuritySep 2026 – Apr 2027Approach now
Concrete and FoundationOct 2026 – Jan 2027Approach now
Structural SteelDec 2026 – Apr 2027Coming up
ElevatorsDec 2026 – Jun 2027Coming up
FramingDec 2026 – Jun 2027Coming up
PaintingJan 2027 – Oct 2027Coming up

How we estimate: each bar is the share of the build, from the estimated start (December 2026) to the estimated completion (April 2029) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 49 Ontario St?

50-Storey Affordable Housing. Construction of two buildings of 46 and 50 storeys with underground parking garage (245 affordable housing units) and townhouses

When was the permit issued for 49 Ontario St?

October 14, 2026, by the City of Toronto.

Who is building 49 Ontario St?

Dream Unlimited Corp. and CentreCourt Developments (joint venture) is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 49 Ontario St need now?

Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete. Coming up: structural steel from December 2026, elevator from December 2026, framing from December 2026 and painting from January 2027.