5 Glen Park Ave, Toronto: Place of Worship Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Place of Worship Renovation at 5 Glen Park Ave, Toronto was permitted on January 16, 2026 with a stated construction value of under $1M. Proposal for interior alterations. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address5 Glen Park Ave, Toronto
NeighbourhoodEnglemount-Lawrence
ProjectPlace of Worship Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedJanuary 16, 2026
Stated construction valueunder $1M
Estimated stageFinishing
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for interior alterations”

Where this project is

  1. December 21, 2018New building
  2. January 16, 2026Addition or alteration: Place of Worship Renovation ยท under $1M (this page)
  3. January 16, 2026Mechanical
  4. January 16, 2026Plumbing
  5. January 2026Estimated construction start (estimate)
  6. August 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

6 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jan 2026 – Aug 2026Estimate
Signage and WayfindingApr 2026 – Jun 2026Window passed (est.)
CountertopsMar 2026 – May 2026Window passed (est.)
Finish CarpentryMar 2026 – May 2026Window passed (est.)
Appliances and EquipmentApr 2026 – May 2026Window passed (est.)
LandscapingApr 2026 – Jun 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (January 2026) to the estimated completion (August 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 5 Glen Park Ave?

Place of Worship Renovation. Proposal for interior alterations

When was the permit issued for 5 Glen Park Ave?

January 16, 2026, by the City of Toronto.

Who is building 5 Glen Park Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 5 Glen Park Ave need now?

Estimated from the permit date, the award windows for signage; countertop; finish carpentry; appliance and equipment; landscaping had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.