5050 Yonge St, Toronto: Office and Tenant Fit-Out

Street view near 5050 Yonge St, Toronto
Street view near this address, photographed February 2025 before the permit. Photo: Dillan Payne, CC BY-SA 2.0, via Wikimedia Commons. Figures read October 24, 2026 from Builtie's permit data.

More photos of this address 1

  • 5050 Yonge St, Toronto: street view near this address, photographed May 2015 before the permit (photo 1 of 1)

    formulanone from Huntsville, United StatesCC BY-SA 2.0 · Commons

Office and Tenant Fit-Out at 5050 Yonge St, Toronto was permitted on September 30, 2025 with a stated construction value of under $1M. Proposal for sump pump replacement and installation of gas powered generator at TDSB head office. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address5050 Yonge St, Toronto
NeighbourhoodWillowdale West
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedSeptember 30, 2025
Stated construction valueunder $1M
Estimated stageLikely complete
Company named on the permitToronto District School Board
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for sump pump replacement and installation of gas powered generator at TDSB head office”

Where this project is

  1. July 8, 2015Fire and life safety: fire protection · under $1M
  2. October 16, 2015Addition or alteration · under $1M
  3. August 15, 2017Fire and life safety
  4. May 6, 2021Addition or alteration: interior alteration · under $1M
  5. September 30, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
  6. March 26, 2026Plumbing
  7. October 2025Estimated construction start (estimate)
  8. April 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 4 more renovations within 1 km

  • 95 Beecroft RdAddition or alteration: roofing · $5M to $10M · November 2025
  • 4881 Yonge StAddition or alteration: structural work · $1M to $5M · March 2026
  • 5095 Yonge StAddition or alteration: interior alteration · $1M to $5M · October 2025
  • 5000 Yonge StAddition or alteration: demolition · $1M to $5M · January 2026
  • 5140 Yonge StAddition or alteration: mechanical · $1M to $5M · March 2026

18 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Toronto District School Board has 14 other projects in Builtie

  • Toronto · Addition or alteration · $1M to $5M · 2025
  • Toronto · Addition or alteration: structural work · $1M to $5M · 2025
  • Toronto · Addition or alteration · $1M to $5M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 5050 Yonge St?

Office and Tenant Fit-Out. Proposal for sump pump replacement and installation of gas powered generator at TDSB head office

When was the permit issued for 5050 Yonge St?

September 30, 2025, by the City of Toronto.

Who is building 5050 Yonge St?

Toronto District School Board is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 5050 Yonge St need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.