5111 21 St SW, Calgary: School Renovation

School Renovation at 5111 21 St SW, Calgary was permitted on October 15, 2026 with a stated construction value of $1M to $5M. Interior Alterations | Central Memorial High School Locker Renovation | Group A2 | 850 sq.m. | 3.2.2.25. NBC(AE) 2023. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 5111 21 St SW, Calgary |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | October 15, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Interior Alterations | Central Memorial High School Locker Renovation | Group A2 | 850 sq.m. | 3.2.2.25. NBC(AE) 2023”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Calgary
- 5727 23 Av SE: Office and Tenant Fit-Out
- 333 Shawnee Cm SW: School
- 440 Silverton Glen Gr SW: Townhomes
- 532 Shawnee Cm SW: Townhomes
- 400 4 Av SW: Office and Tenant Fit-Out
All of them: construction projects in Calgary by address. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 5111 21 St SW?
School Renovation. Interior Alterations | Central Memorial High School Locker Renovation | Group A2 | 850 sq.m. | 3.2.2.25. NBC(AE) 2023
When was the permit issued for 5111 21 St SW?
October 15, 2026, by the City of Calgary.
Who is building 5111 21 St SW?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 5111 21 St SW need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
