514 W Aldine Ave, Chicago: 4-Storey Residential Project

4-Storey Residential Project at 514 W Aldine Ave, Chicago was permitted on October 20, 2025 with a stated construction value of $1M to $5M. Self-cert 2019 cbc: full building permit for 4 story 4 d.u. building with basement, 4 car garage at 1st floor, rooftop deck over garage, front deck & rear porch with stair at 2nd/3rd/4th story, rooftop deck, rooftop stair enclosure, elevator overrun, entire… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 514 W Aldine Ave, Chicago |
| Project | 4-Storey Residential Project |
| Building type | Residential |
| Work | New building |
| Permit issued | October 20, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | Hanna, John C |
| Decision makers and contacts | In Builtie |
From the permit: “Self-cert 2019 cbc: full building permit for 4 story 4 d.u. building with basement, 4 car garage at 1st floor, rooftop deck over garage, front deck & rear porch with stair at 2nd/3rd/4th story, rooftop deck, rooftop stair enclosure, elevator overrun, entire…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 6300 N Ridge Ave: Retail Building Renovation
- 120 S Riverside Plz: Office and Tenant Fit-Out
- 1137 W Altgeld St: 3-Storey Commercial Project
- 11411 S Eggleston Ave: School Renovation
- 1500 N Hoyne Ave: Place of Worship Renovation
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 514 W Aldine Ave?
4-Storey Residential Project. Self-cert 2019 cbc: full building permit for 4 story 4 d.u. building with basement, 4 car garage at 1st floor, rooftop deck over garage, front deck & rear porch with stair at 2nd/3rd/4th story, rooftop deck, rooftop stair enclosure, elevator overrun, entire…
When was the permit issued for 514 W Aldine Ave?
October 20, 2025, by the City of Chicago.
Who is building 514 W Aldine Ave?
Hanna, John C is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 514 W Aldine Ave need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
