529 S Gaffey St, Los Angeles: Warehouse Renovation

Warehouse Renovation at 529 S Gaffey St, Los Angeles was permitted on May 22, 2026 with a stated construction value of under $1M. Remodel of an existing retail space. Demolition of ceiling, lighting, power/data, restrooms. Demo HVAC duct system and soffit. Demolition of double door entry and 2 glass panels. Construction of new partitions, new vestibule, ceiling, lighting, power/data,… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 529 S Gaffey St, Los Angeles |
| Project | Warehouse Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | May 22, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Finishing |
| Company named on the permit | The Hatch Group Inc |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Remodel of an existing retail space. Demolition of ceiling, lighting, power/data, restrooms. Demo HVAC duct system and soffit. Demolition of double door entry and 2 glass panels. Construction of new partitions, new vestibule, ceiling, lighting, power/data,…”
Get new $1M+ projects in Los Angeles every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- May 22, 2026Alteration: Warehouse Renovation · under $1M (this page)
- June 2026Estimated construction start (estimate)
- December 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 435 W 8th StAlteration · $1M to $5M · April 2026
1 project of $1M+ was permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 2 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2026 – Dec 2026 | Estimate |
| Signage and Wayfinding | Sep 2026 – Oct 2026 | Approach now |
| Countertops | Aug 2026 – Sep 2026 | Window passed (est.) |
| Finish Carpentry | Aug 2026 – Sep 2026 | Window passed (est.) |
| Appliances and Equipment | Aug 2026 – Oct 2026 | Approach now |
| Landscaping | Sep 2026 – Nov 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 12050 W Ventura Blvd: Office and Tenant Fit-Out
- 6428 N Platt Ave: Office and Tenant Fit-Out
- 107 S Hewitt St: Apartment Building Renovation
- 301 W 1st St: Parking Structure Renovation
- 14209 W Ventura Blvd: Office and Tenant Fit-Out
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 529 S Gaffey St?
Warehouse Renovation. Remodel of an existing retail space. Demolition of ceiling, lighting, power/data, restrooms. Demo HVAC duct system and soffit. Demolition of double door entry and 2 glass panels. Construction of new partitions, new vestibule, ceiling, lighting, power/data,…
When was the permit issued for 529 S Gaffey St?
May 22, 2026, by the City of Los Angeles.
Who is building 529 S Gaffey St?
The Hatch Group Inc is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 529 S Gaffey St need now?
Estimated as of October 2026, the trades to approach now are signage; appliance and equipment; landscaping. Already passed: countertop and finish carpentry.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
