530 S Mateo St, Los Angeles: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 530 S Mateo St, Los Angeles was permitted on December 24, 2025 with a stated construction value of under $1M. [**initial TI**]TENANT IMPROVEMENT OF AN EXISTING SHELL LEASE SPACE. PROPOSED CHANGE OF USE FROM RETAIL TO RESTAURANT WITH A KITCHEN, DINING, AND BAR SPACE. THE IMPROVEMENTS CONSIST OF NEW INTERIOR FINISHES, INTERIOR FIXTURES INCLUDING KITCHEN, BAR, SERVER… Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address530 S Mateo St, Los Angeles
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedDecember 24, 2025
Stated construction valueunder $1M
Estimated stageInspection
Company named on the permitG C X LLC
Decision makers and contactsSee who to contact — free trial

From the permit: “[**initial TI**]TENANT IMPROVEMENT OF AN EXISTING SHELL LEASE SPACE. PROPOSED CHANGE OF USE FROM RETAIL TO RESTAURANT WITH A KITCHEN, DINING, AND BAR SPACE. THE IMPROVEMENTS CONSIST OF NEW INTERIOR FINISHES, INTERIOR FIXTURES INCLUDING KITCHEN, BAR, SERVER…”

Where this project is

  1. December 24, 2025Alteration: Office and Tenant Fit-Out · under $1M (this page)
  2. January 2026Estimated construction start (estimate)
  3. July 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby: 4 more renovations within 1 km

  • 433 S Colyton StAlteration: addition · $1M to $5M · November 2025
  • 1019 E 4th PlAlteration · $1M to $5M · April 2026
  • 813 E 4Th Place, Los AngelesAddition or alteration: mechanical · $1M to $5M · May 2026
  • 929 E 2nd StAddition · $1M to $5M · March 2026

4 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–4, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

G C X LLC has 17 other projects in Builtie

  • Los Angeles · Alteration: structural work · $1M to $5M · 2026
  • Los Angeles · Interior alteration · $1M to $5M · 2026
  • Los Angeles · Interior alteration · $1M to $5M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Los Angeles

All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 530 S Mateo St?

Office and Tenant Fit-Out. [**initial TI**]TENANT IMPROVEMENT OF AN EXISTING SHELL LEASE SPACE. PROPOSED CHANGE OF USE FROM RETAIL TO RESTAURANT WITH A KITCHEN, DINING, AND BAR SPACE. THE IMPROVEMENTS CONSIST OF NEW INTERIOR FINISHES, INTERIOR FIXTURES INCLUDING KITCHEN, BAR, SERVER…

When was the permit issued for 530 S Mateo St?

December 24, 2025, by the City of Los Angeles.

Who is building 530 S Mateo St?

G C X LLC is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 530 S Mateo St need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.