5327 N Canoga Ave, Los Angeles: Duplex Renovation

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

Duplex Renovation at 5327 N Canoga Ave, Los Angeles was permitted on November 20, 2025 with a stated construction value of under $1M. Renovation or addition to a duplex. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address5327 N Canoga Ave, Los Angeles
ProjectDuplex Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedNovember 20, 2025
Stated construction valueunder $1M
Estimated stageFinishing
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. November 20, 2025Addition: Duplex Renovation ยท under $1M (this page)
  2. December 2025Estimated construction start (estimate)
  3. June 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Dec 2025 – Jun 2026Estimate
Signage and WayfindingFeb 2026 – Apr 2026Window passed (est.)
CountertopsFeb 2026 – Mar 2026Window passed (est.)
Finish CarpentryFeb 2026 – Mar 2026Window passed (est.)
Appliances and EquipmentFeb 2026 – Apr 2026Window passed (est.)
LandscapingMar 2026 – May 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (December 2025) to the estimated completion (June 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Los Angeles

All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 5327 N Canoga Ave?

Duplex Renovation. Renovation or addition to a duplex.

When was the permit issued for 5327 N Canoga Ave?

November 20, 2025, by the City of Los Angeles.

Who is building 5327 N Canoga Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 5327 N Canoga Ave need now?

Estimated from the permit date, the award windows for signage; countertop; finish carpentry; appliance and equipment; landscaping had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.