55 Charles St W, Toronto: Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

Apartment Building Renovation at 55 Charles St W, Toronto was permitted on April 1, 2025 with a stated construction value of under $1M. Proposed heating boiler replacement. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address55 Charles St W, Toronto
NeighbourhoodBay-Cloverhill
ProjectApartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedApril 1, 2025
Stated construction valueunder $1M
Estimated stageMechanical
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed heating boiler replacement”

Where this project is

  1. Since August 20061 other permit at this address
  2. August 8, 2006Mechanical · under $1M
  3. June 3, 2009Fire and life safety: fire protection · under $1M
  4. November 24, 2010Addition or alteration
  5. July 20, 2012Fire and life safety: fire protection
  6. June 24, 2014Addition or alteration · under $1M
  7. April 1, 2025Mechanical: Apartment Building Renovation · under $1M (this page)
  8. May 2025Estimated construction start (estimate)
  9. November 2025Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 717 Church StNew building · $100M to $250M · March 2026
  • 900 Bay StAddition or alteration: interior alteration · $25M to $50M · April 2026
  • 150 College StAddition or alteration: demolition · $25M to $50M · May 2026
  • 112 College StAddition or alteration: interior alteration · $10M to $25M · June 2026
  • 61 Yorkville AveAddition or alteration: interior alteration · $5M to $10M · November 2025

29 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)May 2025 – Nov 2025Estimate
Construction Site SecurityApr 2025 – May 2025Window passed (est.)
PaintingMay 2025 – Jul 2025Window passed (est.)
ElectricalMay 2025 – Jul 2025Window passed (est.)
HVAC and MechanicalMay 2025 – Jul 2025Window passed (est.)
PlumbingMay 2025 – Jul 2025Window passed (est.)
Fire ProtectionMay 2025 – Jul 2025Window passed (est.)
Signage and WayfindingJul 2025 – Aug 2025Window passed (est.)
InsulationJun 2025 – Jul 2025Window passed (est.)
DrywallJun 2025 – Jul 2025Window passed (est.)
Low Voltage and DataJun 2025 – Jul 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (May 2025) to the estimated completion (November 2025) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 55 Charles St W?

Apartment Building Renovation. Proposed heating boiler replacement

When was the permit issued for 55 Charles St W?

April 1, 2025, by the City of Toronto.

Who is building 55 Charles St W?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 55 Charles St W need now?

Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.