55 E 10th Avenue, Vancouver: Apartment Building Renovation

Apartment Building Renovation at 55 E 10th Avenue, Vancouver was permitted on March 6, 2025 with a stated construction value of $1M to $5M. Field Review - Addition / Alteration - Exterior alterations for podium membrane renewal to this existing multiple dwelling building on this site. Sheikhakbari on Jan 23, 2025 NOTE: - Schedule A, B-Arch & D: Mark Westerink, P. Eng., 604 873 1181 (RDH Building… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 55 E 10th Avenue, Vancouver |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | March 6, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Mechanical |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Field Review - Addition / Alteration - Exterior alterations for podium membrane renewal to this existing multiple dwelling building on this site. Sheikhakbari on Jan 23, 2025 NOTE: - Schedule A, B-Arch & D: Mark Westerink, P. Eng., 604 873 1181 (RDH Building…”
Which trades are being bought now
The project is with the mechanical, electrical and plumbing rough-in under way. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Vancouver
- 2305 W 16th Avenue: Apartment Building
- 2667 E Pender Street: Apartment Building
- 3231 E 53rd Avenue: Apartment Building
- 3268 E 18th Avenue: Apartment Building
- 450 SW Marine Drive: Office and Tenant Fit-Out
All of them: construction projects in Vancouver by address. The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 55 E 10th Avenue?
Apartment Building Renovation. Field Review - Addition / Alteration - Exterior alterations for podium membrane renewal to this existing multiple dwelling building on this site. Sheikhakbari on Jan 23, 2025 NOTE: - Schedule A, B-Arch & D: Mark Westerink, P. Eng., 604 873 1181 (RDH Building…
When was the permit issued for 55 E 10th Avenue?
March 6, 2025, by the City of Vancouver.
Who is building 55 E 10th Avenue?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 55 E 10th Avenue need now?
At its current stage: site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
