5600 Yonge St, Toronto: Transit Facility Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Transit Facility Renovation at 5600 Yonge St, Toronto was permitted on July 18, 2025 with a stated construction value of under $1M. Proposal for Finch Subway Station entrances at Yonge and Pemberton roofing rehabilitation, which at Yonge entrance requires roof mounted guard rails. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address5600 Yonge St, Toronto
NeighbourhoodNewtonbrook East
ProjectTransit Facility Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedJuly 18, 2025
Stated construction valueunder $1M
Estimated stageLikely complete
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for Finch Subway Station entrances at Yonge and Pemberton roofing rehabilitation, which at Yonge entrance requires roof mounted guard rails”

Where this project is

  1. Since September 20047 other permits at this address
  2. August 17, 2005Mechanical
  3. September 14, 2017Addition or alteration
  4. December 6, 2019Addition or alteration: interior alteration · under $1M
  5. May 22, 2025Addition or alteration · under $1M
  6. July 18, 2025Addition or alteration: Transit Facility Renovation · under $1M (this page)
  7. May 13, 2026Addition or alteration: elevator · under $1M
  8. August 2025Estimated construction start (estimate)
  9. February 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 4 more renovations within 1 km

  • 227 Drewry AveAddition or alteration: elevator · $1M to $5M · April 2026
  • 20 Olive AveAddition or alteration: facade work · $1M to $5M · June 2026
  • 20 Church AveAddition or alteration: interior alteration · $1M to $5M · July 2026
  • 5650 Yonge StAddition or alteration: demolition · $1M to $5M · March 2026
  • 415 Willowdale AveAddition or alteration · $1M to $5M · April 2026

7 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 5600 Yonge St?

Transit Facility Renovation. Proposal for Finch Subway Station entrances at Yonge and Pemberton roofing rehabilitation, which at Yonge entrance requires roof mounted guard rails

When was the permit issued for 5600 Yonge St?

July 18, 2025, by the City of Toronto.

Who is building 5600 Yonge St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 5600 Yonge St need now?

It depends on the stage; Builtie tracks it.