6043-6071 Yonge St, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 6043-6071 Yonge St, Toronto was permitted on February 11, 2026 with a stated construction value of under $1M. Proposed interior alterations to convert the existing office to a dental office. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 6043-6071 Yonge St, Toronto |
| Neighbourhood | Newtonbrook East |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | February 11, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed interior alterations to convert the existing office to a dental office”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since November 20093 other permits at this address
- November 23, 2009Plumbing · under $1M
- October 22, 2015Addition or alteration: interior alteration · under $1M
- September 18, 2018Addition or alteration: interior alteration · under $1M
- August 19, 2019Addition or alteration · under $1M
- May 16, 2022Addition or alteration: demolition · under $1M
- February 11, 2026Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- February 2026Estimated construction start (estimate)
- September 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 6464 Yonge StAddition or alteration: demolition · $1M to $5M · April 2026
- 8 Nipigon AveDemolition · $1M to $5M · February 2026
- 7 Steeles Ave EDemolition · $1M to $5M · February 2026
- 182 Connaught AveNew building · $1M to $5M · June 2026
- 133 Moore Park AveNew construction · $1M to $5M · March 2026
15 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Feb 2026 – Sep 2026 | Estimate |
| Fire Protection | Mar 2026 – May 2026 | Window passed (est.) |
| Signage and Wayfinding | May 2026 – Jul 2026 | Window passed (est.) |
| Insulation | Apr 2026 – May 2026 | Window passed (est.) |
| Drywall | Apr 2026 – May 2026 | Window passed (est.) |
| Low Voltage and Data | Apr 2026 – May 2026 | Window passed (est.) |
| Tile | Apr 2026 – Jun 2026 | Window passed (est.) |
| Cabinetry and Millwork | Apr 2026 – May 2026 | Window passed (est.) |
| Flooring | Apr 2026 – Jun 2026 | Window passed (est.) |
| Countertops | Apr 2026 – Jun 2026 | Window passed (est.) |
| Finish Carpentry | Apr 2026 – Jun 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (February 2026) to the estimated completion (September 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 5600 Yonge St: Transit Facility Renovation
- 1041 Willowdale Ave: Retail Building
- 21 Winlock Pk: Apartment Building Renovation
- 7 Steeles Ave E: Retail Building Renovation
- 8 Nipigon Ave: Retail Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 6043-6071 Yonge St?
Office and Tenant Fit-Out. Proposed interior alterations to convert the existing office to a dental office
When was the permit issued for 6043-6071 Yonge St?
February 11, 2026, by the City of Toronto.
Who is building 6043-6071 Yonge St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 6043-6071 Yonge St need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.