57 Soudan Ave, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 57 Soudan Ave, Toronto was permitted on September 5, 2025 with a stated construction value of under $1M. Proposal for interior alterations to create dentisty office on first and second floors. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 57 Soudan Ave, Toronto |
| Neighbourhood | South Eglinton-Davisville |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | September 5, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for interior alterations to create dentisty office on first and second floors”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- September 5, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- September 5, 2025Mechanical
- December 11, 2025Plumbing
- October 2025Estimated construction start (estimate)
- April 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 170 Roehampton AveNew building · over $250M · July 2026
- 110 Broadway AveNew construction: excavation and shoring · $100M to $250M · February 2026
- 100 Broadway AveNew construction: excavation and shoring · $50M to $100M · February 2026
- 2200 Yonge StAddition or alteration: demolition · $50M to $100M · April 2026
- 2180 Yonge StAddition or alteration: elevator · $25M to $50M · March 2026
17 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Oct 2025 – Apr 2026 | Estimate |
| Fire Protection | Nov 2025 – Dec 2025 | Window passed (est.) |
| Signage and Wayfinding | Dec 2025 – Jan 2026 | Window passed (est.) |
| Insulation | Nov 2025 – Dec 2025 | Window passed (est.) |
| Drywall | Nov 2025 – Dec 2025 | Window passed (est.) |
| Low Voltage and Data | Nov 2025 – Dec 2025 | Window passed (est.) |
| Tile | Nov 2025 – Jan 2026 | Window passed (est.) |
| Cabinetry and Millwork | Nov 2025 – Dec 2025 | Window passed (est.) |
| Flooring | Nov 2025 – Jan 2026 | Window passed (est.) |
| Countertops | Nov 2025 – Jan 2026 | Window passed (est.) |
| Finish Carpentry | Nov 2025 – Jan 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (October 2025) to the estimated completion (April 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 107 Redpath Ave: Apartment Building Renovation
- 384 Mount Pleasant Rd: Apartment Building Renovation
- 18 Merton St: Apartment Building Renovation
- 75 Holly St: Parking Structure Renovation
- 225 Merton St: Condominium Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 57 Soudan Ave?
Office and Tenant Fit-Out. Proposal for interior alterations to create dentisty office on first and second floors
When was the permit issued for 57 Soudan Ave?
September 5, 2025, by the City of Toronto.
Who is building 57 Soudan Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 57 Soudan Ave need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.