75 Holly St, Toronto: Parking Structure Renovation

Parking Structure Renovation at 75 Holly St, Toronto was permitted on March 28, 2025 with a stated construction value of $1M to $5M. Proposed parking garage structural repairs, waterproofing and other plumbing and mechanical updates. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 75 Holly St, Toronto |
| Neighbourhood | South Eglinton-Davisville |
| Project | Parking Structure Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | March 28, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Mechanical |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposed parking garage structural repairs, waterproofing and other plumbing and mechanical updates”
Which trades are being bought now
The project is with the mechanical, electrical and plumbing rough-in under way. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 26 Millwood Rd: Office and Tenant Fit-Out
- 289 Balliol St: 31-Storey Apartment Building Renovation
- 1 Dromore Cres: Residential Project Renovation
- 1 Ibms Ward 05: Transit Facility Renovation
- 1 Ibms Ward 10: Transit Facility Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 75 Holly St?
Parking Structure Renovation. Proposed parking garage structural repairs, waterproofing and other plumbing and mechanical updates
When was the permit issued for 75 Holly St?
March 28, 2025, by the City of Toronto.
Who is building 75 Holly St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 75 Holly St need now?
At its current stage: site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
