570 Shaw St, Toronto: School Renovation

School Renovation at 570 Shaw St, Toronto was permitted on June 26, 2025 with a stated construction value of $1M to $5M. Enclosing existing skylight with new standing seam roof system and structural walkway upgrades in attic. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 570 Shaw St, Toronto |
| Neighbourhood | Palmerston-Little Italy |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | June 26, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Toronto District School Board |
| Decision makers and contacts | In Builtie |
From the permit: “Enclosing existing skylight with new standing seam roof system and structural walkway upgrades in attic”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1 Thorncliffe Park Dr: Transit Facility
- 100 Harbour St: Office and Tenant Fit-Out
- 1065 Kipling Ave: Residential Project Renovation
- 110 Clovelly Ave: 3-Storey Retail Building Renovation
- 12 R Strachan Ave: Transit Facility
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 570 Shaw St?
School Renovation. Enclosing existing skylight with new standing seam roof system and structural walkway upgrades in attic
When was the permit issued for 570 Shaw St?
June 26, 2025, by the City of Toronto.
Who is building 570 Shaw St?
Toronto District School Board is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 570 Shaw St need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
