5720 W Centinela Ave, Los Angeles: Apartment Building Renovation

Apartment Building Renovation at 5720 W Centinela Ave, Los Angeles was permitted on February 20, 2025 with a stated construction value of under $1M. Interior install non-bearing partition walls and new washer and dryers in 99 units at existing apartment building. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 5720 W Centinela Ave, Los Angeles |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | February 20, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Mechanical |
| Company named on the permit | L E K Enterprises Inc |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Interior install non-bearing partition walls and new washer and dryers in 99 units at existing apartment building”
Get new $1M+ projects in Los Angeles every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- February 20, 2025Alteration: Apartment Building Renovation · under $1M (this page)
- March 2025Estimated construction start (estimate)
- September 2025Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 6055 W Center DrNew construction · $100M to $250M · August 2026
1 project of $1M+ was permitted within 1 km in the last 12 months. See them all in Builtie →
L E K Enterprises Inc has 8 other projects in Builtie
- Los Angeles · Interior alteration · under $1M · 2025
- Los Angeles · Interior alteration · under $1M · 2025
- Los Angeles · Alteration: structural work · under $1M · 2025
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Mar 2025 – Sep 2025 | Estimate |
| Construction Site Security | Mar 2025 – Apr 2025 | Window passed (est.) |
| Painting | Mar 2025 – May 2025 | Window passed (est.) |
| Electrical | Apr 2025 – May 2025 | Window passed (est.) |
| HVAC and Mechanical | Apr 2025 – May 2025 | Window passed (est.) |
| Plumbing | Apr 2025 – May 2025 | Window passed (est.) |
| Fire Protection | Apr 2025 – May 2025 | Window passed (est.) |
| Signage and Wayfinding | Jun 2025 – Jul 2025 | Window passed (est.) |
| Insulation | Apr 2025 – Jun 2025 | Window passed (est.) |
| Drywall | May 2025 – Jun 2025 | Window passed (est.) |
| Low Voltage and Data | May 2025 – Jun 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (March 2025) to the estimated completion (September 2025) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 12775 W Millennium: Office and Tenant Fit-Out
- 20800 W Sherman Way: Office and Tenant Fit-Out
- 3903 W Sunset Blvd: Office and Tenant Fit-Out
- 758 N Highland Ave: Office and Tenant Fit-Out
- 4501 W Colorado Blvd: Apartment Building Renovation
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 5720 W Centinela Ave?
Apartment Building Renovation. Interior install non-bearing partition walls and new washer and dryers in 99 units at existing apartment building
When was the permit issued for 5720 W Centinela Ave?
February 20, 2025, by the City of Los Angeles.
Who is building 5720 W Centinela Ave?
L E K Enterprises Inc is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 5720 W Centinela Ave need now?
Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.