5968 Cornelia Mews, Vancouver: School Renovation

School Renovation at 5968 Cornelia Mews, Vancouver was permitted on August 15, 2025 with a stated construction value of $10M to $25M. Addition / Alteration - #210 (Fairleigh Dickinson University) First Tenant Improvement for this Post Secondary School (Group A2) on the second level of the Oakridge Mall. Note: - Building 12. Change of use from Office to "School - University or College" is… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 5968 Cornelia Mews, Vancouver |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | August 15, 2025 |
| Stated construction value | $10M to $25M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Addition / Alteration - #210 (Fairleigh Dickinson University) First Tenant Improvement for this Post Secondary School (Group A2) on the second level of the Oakridge Mall. Note: - Building 12. Change of use from Office to "School - University or College" is…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Vancouver
- 2061 Beach Avenue: Rental Building Renovation
- 791 W Georgia Street: Hotel Renovation
- 2250 Nanaimo Street: 5-Storey Apartment Building
- 4577 Clancy Loranger Way: 2-Storey Retail Building
- 658 Homer Street: Office and Tenant Fit-Out
All of them: construction projects in Vancouver by address. The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 5968 Cornelia Mews?
School Renovation. Addition / Alteration - #210 (Fairleigh Dickinson University) First Tenant Improvement for this Post Secondary School (Group A2) on the second level of the Oakridge Mall. Note: - Building 12. Change of use from Office to "School - University or College" is…
When was the permit issued for 5968 Cornelia Mews?
August 15, 2025, by the City of Vancouver.
Who is building 5968 Cornelia Mews?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 5968 Cornelia Mews need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.