6066 W Olympic Blvd, Los Angeles: Mixed-Use Building

Mixed-Use Building at 6066 W Olympic Blvd, Los Angeles was permitted on March 4, 2025 with a stated construction value of $10M to $25M. New Mixed Use Building. 2 Levels of Type IA Construction - Below Grade Parking, Type IA Construction - Ground Floor Retail (3692 SF), Parking and amenities under (5) Levels of Type IIIA Construction 120 Residential Units.12 units restricted to Extremely Low… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 6066 W Olympic Blvd, Los Angeles |
| Project | Mixed-Use Building |
| Building type | Residential |
| Work | New building |
| Permit issued | March 4, 2025 |
| Stated construction value | $10M to $25M |
| Estimated stage | Framing |
| Company named on the permit | Frymer Construction |
| Decision makers and contacts | In Builtie |
From the permit: “New Mixed Use Building. 2 Levels of Type IA Construction - Below Grade Parking, Type IA Construction - Ground Floor Retail (3692 SF), Parking and amenities under (5) Levels of Type IIIA Construction 120 Residential Units.12 units restricted to Extremely Low…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 100 S Normandie Ave: 5-Storey Apartment Building
- 12124 W Pacific Ave: Apartment Building
- 16670 W Roscoe Blvd: Office and Tenant Fit-Out
- 201 S Alvarado St: 8-Storey Affordable Housing Renovation
- 20801 W Rinaldi St: 2-Storey School Renovation
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Pasadena, Glendale, Burbank, Long Beach and the rest of Los Angeles County issue their own permits and are not in the feed today. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 6066 W Olympic Blvd?
Mixed-Use Building. New Mixed Use Building. 2 Levels of Type IA Construction - Below Grade Parking, Type IA Construction - Ground Floor Retail (3692 SF), Parking and amenities under (5) Levels of Type IIIA Construction 120 Residential Units.12 units restricted to Extremely Low…
When was the permit issued for 6066 W Olympic Blvd?
March 4, 2025, by the City of Los Angeles.
Who is building 6066 W Olympic Blvd?
Frymer Construction is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 6066 W Olympic Blvd need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
