608 Via de la Paz, Pacific Palisades: New accessory dwelling unit (ADU) After the 2025 Fire

New accessory dwelling unit (ADU) at 608 Via de la Paz, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on December 15, 2025 with a stated construction value of under $250K, and the rebuild is in the finishing stage (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 608 Via de la Paz, Pacific Palisades, Los Angeles, CA |
| City permit address | 608 N Via De La Paz |
| Rebuild | New accessory dwelling unit (ADU) |
| What the plans show | 1 storey, detached garage, accessory dwelling unit, fire sprinklers throughout |
| Rebuild track | Like-for-like rebuild (the City's expedited track under Emergency Executive Order 1) |
| Building permit issued | December 15, 2025 |
| Status | In the finishing stage (Builtie's estimate) |
| Stated construction value | under $250K |
| Builder named on the permits | Resolved in Builtie |
| Permits at this address since the fire | 2 |
The facts above are read from the City of Los Angeles building permits filed for 608 Via de la Paz since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| December 15, 2025 | New accessory dwelling unit (ADU) | Issued |
| May 15, 2026 | Repair or alteration | Issued |
2 permits since December 15, 2025. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
608 Via de la Paz is in the finishing stage (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Signage and Wayfinding | 25% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
| Appliances and Equipment | 65% to 90% |
| Landscaping | 65% to 90% |
Other rebuilds on Via de la Paz
- 569 Via de la Paz: New single-family home, likely complete
- 581 Via de la Paz: New single-family home, framing
- 601 Via de la Paz: New single-family home, framing
- 610 Via de la Paz: New single-family home, framing
- 626 Via de la Paz: New single-family home, framing
- 631 Via de la Paz: New single-family home, foundation
- 640 Via de la Paz: New single-family home, finaled
- 646 Via de la Paz: New single-family home, foundation
All of them: fire rebuilds on Via de la Paz. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 608 Via de la Paz, Pacific Palisades?
New accessory dwelling unit (ADU) (1 storey, detached garage, accessory dwelling unit, fire sprinklers throughout), permitted December 15, 2025 after the January 2025 Palisades Fire.
What is the status of the rebuild at 608 Via de la Paz?
It is in the finishing stage (Builtie's estimate), read October 20, 2026.
Is 608 Via de la Paz a like-for-like rebuild?
Yes. The City marked its permit eligible for the expedited like-for-like track.
Who is building 608 Via de la Paz?
Builtie resolves the builder behind the permits and attaches a verified decision maker.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
