610 W Channel St, Los Angeles: Commercial Project

Commercial Project at 610 W Channel St, Los Angeles was permitted on March 26, 2025 with a stated construction value of under $1M. (n) 6' wide concrete pedestrian path 7 light poles with security cameras 8' ht chain link fence, existing driveway repai, parking restriping within caltrans park and ride lot. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 610 W Channel St, Los Angeles |
| Project | Commercial Project |
| Building type | Commercial |
| Work | New building |
| Permit issued | March 26, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Mechanical |
| Company named on the permit | Axiom Group |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “(n) 6' wide concrete pedestrian path 7 light poles with security cameras 8' ht chain link fence, existing driveway repai, parking restriping within caltrans park and ride lot”
Get new $1M+ projects in Los Angeles every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- March 26, 2025New construction: Commercial Project · under $1M (this page)
- April 2025Estimated construction start (estimate)
- October 2025Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Axiom Group has 2 other projects in Builtie
- Los Angeles · New construction · under $1M · 2025
- Los Angeles · Alteration · under $1M · 2025
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Apr 2025 – Oct 2025 | Estimate |
| Construction Site Security | Apr 2025 – May 2025 | Window passed (est.) |
| Painting | May 2025 – Jun 2025 | Window passed (est.) |
| Electrical | May 2025 – Jun 2025 | Window passed (est.) |
| HVAC and Mechanical | May 2025 – Jun 2025 | Window passed (est.) |
| Plumbing | May 2025 – Jun 2025 | Window passed (est.) |
| Fire Protection | May 2025 – Jun 2025 | Window passed (est.) |
| Signage and Wayfinding | Jul 2025 – Aug 2025 | Window passed (est.) |
| Insulation | Jun 2025 – Jul 2025 | Window passed (est.) |
| Drywall | Jun 2025 – Jul 2025 | Window passed (est.) |
| Low Voltage and Data | Jun 2025 – Jul 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (April 2025) to the estimated completion (October 2025) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 4239 N Via Arbolada: Apartment Building Renovation
- 14445 W Sherman Way: Office and Tenant Fit-Out
- 333 E Jefferson Blvd: Warehouse Renovation
- 8960 N Tampa Ave: Office and Tenant Fit-Out
- 19001 S Harborgate Way: Apartment Building Renovation
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 610 W Channel St?
Commercial Project. (n) 6' wide concrete pedestrian path 7 light poles with security cameras 8' ht chain link fence, existing driveway repai, parking restriping within caltrans park and ride lot
When was the permit issued for 610 W Channel St?
March 26, 2025, by the City of Los Angeles.
Who is building 610 W Channel St?
Axiom Group is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 610 W Channel St need now?
Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.