675 Ontario St, Toronto: School Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

School Renovation at 675 Ontario St, Toronto was permitted on June 4, 2026 with a stated construction value of under $1M. Proposal to renovate exisitng boys and girls main floor washrooms and new ceiling in rooms below. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address675 Ontario St, Toronto
NeighbourhoodNorth St.James Town
ProjectSchool Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedJune 4, 2026
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal to renovate exisitng boys and girls main floor washrooms and new ceiling in rooms below”

Where this project is

  1. Since December 20051 other permit at this address
  2. December 29, 2005Mechanical
  3. January 24, 2006Mechanical
  4. December 22, 2017Addition or alteration: foundation · $1M to $5M
  5. May 28, 2019Addition or alteration: mechanical · under $1M
  6. June 4, 2026Addition or alteration: School Renovation · under $1M (this page)
  7. June 15, 2026Plumbing
  8. June 2026Estimated construction start (estimate)
  9. January 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 4 more renovations within 1 km

  • 227 Gerrard St ENew building · $25M to $50M · October 2025
  • 120 Bloor St EAddition or alteration: interior alteration · $1M to $5M · December 2025
  • 130 Carlton StAddition or alteration: roofing · $1M to $5M · April 2026
  • 550 Ontario StAddition or alteration: roofing · $1M to $5M · January 2026
  • 134 Carlton StAddition or alteration · $1M to $5M · November 2025

9 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jun 2026 – Jan 2027Estimate
Construction Site SecurityMay 2026 – Jul 2026Window passed (est.)
PaintingJun 2026 – Aug 2026Window passed (est.)
MasonryJun 2026 – Jul 2026Window passed (est.)
WaterproofingJun 2026 – Jul 2026Window passed (est.)
RoofingJul 2026 – Aug 2026Window passed (est.)
Windows, Doors and GlazingJun 2026 – Aug 2026Window passed (est.)
ElectricalJul 2026 – Aug 2026Window passed (est.)
HVAC and MechanicalJul 2026 – Aug 2026Window passed (est.)
PlumbingJul 2026 – Aug 2026Window passed (est.)
Fire ProtectionJul 2026 – Aug 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 675 Ontario St?

School Renovation. Proposal to renovate exisitng boys and girls main floor washrooms and new ceiling in rooms below

When was the permit issued for 675 Ontario St?

June 4, 2026, by the City of Toronto.

Who is building 675 Ontario St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 675 Ontario St need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.