700 Arrow Rd, Toronto: Transit Facility Renovation

Transit Facility Renovation at 700 Arrow Rd, Toronto was permitted on January 13, 2026 with a stated construction value of $5M to $10M. Proposal to replace six(6) bus hoists and associated components in an existing TTC bus maintenance facility. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 700 Arrow Rd, Toronto |
| Neighbourhood | Humbermede |
| Project | Transit Facility Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | January 13, 2026 |
| Stated construction value | $5M to $10M |
| Estimated stage | Foundation |
| Company named on the permit | Toronto Transit Commission |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal to replace six(6) bus hoists and associated components in an existing TTC bus maintenance facility”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 10 Madison Ave: Transit Facility Renovation
- 2250 Markham Rd: 5-Storey Self-Storage Building
- 1660 Bloor St W: 13-Storey Condominium
- 17 Dora Ave: Transit Facility
- 130 Horner Ave: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 700 Arrow Rd?
Transit Facility Renovation. Proposal to replace six(6) bus hoists and associated components in an existing TTC bus maintenance facility
When was the permit issued for 700 Arrow Rd?
January 13, 2026, by the City of Toronto.
Who is building 700 Arrow Rd?
Toronto Transit Commission is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 700 Arrow Rd need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
