Apartment Building Renovation at 75 Eastdale Ave, Toronto was permitted on June 20, 2025 with a stated construction value of under $1M. Proposal for targeted concrete repairs at the suspended slab, deteriorated beams, trench drain, and foundation walls; localized elastomeric waterproofing at suspended slab concrete repair areas; targeted suspended slab drain replacement and associated piping;… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 75 Eastdale Ave, Toronto |
| Neighbourhood | Taylor-Massey |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | June 20, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Cogir |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for targeted concrete repairs at the suspended slab, deteriorated beams, trench drain, and foundation walls; localized elastomeric waterproofing at suspended slab concrete repair areas; targeted suspended slab drain replacement and associated piping;…”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- June 20, 2022Fire and life safety
- June 20, 2025Addition or alteration: Apartment Building Renovation · under $1M (this page)
- August 8, 2025Mechanical: conversion to residential
- August 8, 2025Addition or alteration: conversion to residential · under $1M
- August 8, 2025Plumbing: conversion to residential
- July 2025Estimated construction start (estimate)
- January 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 7-11 Crescent PlAddition or alteration: interior alteration · $5M to $10M · May 2026
- 4 Massey SqDesignated Structures · $1M to $5M · April 2026
- 777 Victoria Park AveAddition or alteration · $1M to $5M · April 2026
6 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Cogir has 2 other projects in Builtie
- Toronto · Mechanical · $5M to $10M · 2025
- Toronto · Fire and life safety: fire protection · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2025 – Jan 2026 | Estimate |
| Fire Protection | Aug 2025 – Sep 2025 | Window passed (est.) |
| Signage and Wayfinding | Oct 2025 – Nov 2025 | Window passed (est.) |
| Insulation | Aug 2025 – Oct 2025 | Window passed (est.) |
| Drywall | Sep 2025 – Oct 2025 | Window passed (est.) |
| Low Voltage and Data | Sep 2025 – Oct 2025 | Window passed (est.) |
| Tile | Sep 2025 – Oct 2025 | Window passed (est.) |
| Cabinetry and Millwork | Sep 2025 – Oct 2025 | Window passed (est.) |
| Flooring | Sep 2025 – Oct 2025 | Window passed (est.) |
| Countertops | Sep 2025 – Oct 2025 | Window passed (est.) |
| Finish Carpentry | Sep 2025 – Oct 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2025) to the estimated completion (January 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1 Massey Sq: Apartment Building Renovation
- 3003 Danforth Ave: Warehouse Renovation
- 1897 Eglinton Ave E: Office and Tenant Fit-Out
- 55 Charles St W: Apartment Building Renovation
- 344 Dundas St W: Residential Project Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 75 Eastdale Ave?
Apartment Building Renovation. Proposal for targeted concrete repairs at the suspended slab, deteriorated beams, trench drain, and foundation walls; localized elastomeric waterproofing at suspended slab concrete repair areas; targeted suspended slab drain replacement and associated piping;…
When was the permit issued for 75 Eastdale Ave?
June 20, 2025, by the City of Toronto.
Who is building 75 Eastdale Ave?
Cogir is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 75 Eastdale Ave need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.