756 N Milwaukee Ave, Chicago: Warehouse

Warehouse at 756 N Milwaukee Ave, Chicago was permitted on March 31, 2025 with a stated construction value of $5M to $10M. Spr 2019 cbrc: revision to permit 101035924. revision eliminates storage spaces for the third floor residential occupants in the lower level and relinquishes the spaces to the cultural exhibits museum and only requires 2 exits.the interior stair shown on… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 756 N Milwaukee Ave, Chicago |
| Project | Warehouse |
| Building type | Institutional |
| Work | New building |
| Permit issued | March 31, 2025 |
| Stated construction value | $5M to $10M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Spr 2019 cbrc: revision to permit 101035924. revision eliminates storage spaces for the third floor residential occupants in the lower level and relinquishes the spaces to the cultural exhibits museum and only requires 2 exits.the interior stair shown on…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 1101 W Argyle St: 5-Storey Mixed-Use Building
- 118 S Clinton St: 7-Storey Office-to-Residential Conversion
- 1210 W 59th St: Office and Tenant Fit-Out
- 130 E Randolph St: Office and Tenant Fit-Out
- 150 N Michigan Ave: Office and Tenant Fit-Out
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 756 N Milwaukee Ave?
Warehouse. Spr 2019 cbrc: revision to permit 101035924. revision eliminates storage spaces for the third floor residential occupants in the lower level and relinquishes the spaces to the cultural exhibits museum and only requires 2 exits.the interior stair shown on…
When was the permit issued for 756 N Milwaukee Ave?
March 31, 2025, by the City of Chicago.
Who is building 756 N Milwaukee Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 756 N Milwaukee Ave need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
