7777 S Garnett Rd, Broken Arrow: Place of Worship Renovation

Place of Worship Renovation at 7777 S Garnett Rd, Broken Arrow was permitted on May 30, 2025. Anthem Church - Classroom addition to existing church. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 7777 S Garnett Rd, Broken Arrow |
| Project | Place of Worship Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | May 30, 2025 |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Anthem Church - Classroom addition to existing church”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Broken Arrow
- 2300 E Hillside Dr: Commercial Project Renovation
- 1205 E Kenosha St: Place of Worship Renovation
- 5229 S Aspen Ave: Commercial Project
- 5221 S Aspen Ave: Commercial Project
- 1421 N Aspen Ave: Apartment Building
All of them: construction projects in Broken Arrow by address. The data is Broken Arrow's own building permits. Neighbouring cities issue their own permits and are not in this count. It is a smaller feed than Tulsa's, so the counts move more from month to month.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 7777 S Garnett Rd?
Place of Worship Renovation. Anthem Church - Classroom addition to existing church
When was the permit issued for 7777 S Garnett Rd?
May 30, 2025, by the City of Broken Arrow.
Who is building 7777 S Garnett Rd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 7777 S Garnett Rd need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
