784 Ocampo Dr, Pacific Palisades: New single-family home After the 2025 Fire

New single-family home at 784 Ocampo Dr, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on October 29, 2025 with a stated construction value of $500K to $1M, and the rebuild is with the structure going up (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 784 Ocampo Dr, Pacific Palisades, Los Angeles, CA |
| City permit address | 784 N Ocampo Dr |
| Rebuild | New single-family home |
| What the plans show | 2 storeys, basement, attached garage, pool or spa, fire sprinklers throughout |
| Rebuild track | Not like-for-like, so it went through the City's standard plan review |
| Building permit issued | October 29, 2025 |
| Status | With the structure going up (Builtie's estimate) |
| Stated construction value | $500K to $1M |
| Builder named on the permits | Yaz Construction Inc |
| Permits at this address since the fire | 6 |
The facts above are read from the City of Los Angeles building permits filed for 784 Ocampo Dr since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| October 29, 2025 | New single-family home | Issued |
| October 29, 2025 | Pool and spa | Issued |
| October 29, 2025 | Temporary shoring | Issued |
| October 29, 2025 | Grading | Issued |
| January 22, 2026 | Addition: revision to an earlier permit | Issued |
| January 22, 2026 | Pool and spa: revision to an earlier permit | Issued |
6 permits since October 29, 2025. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
784 Ocampo Dr is with the structure going up (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
Other rebuilds on Ocampo Dr
- 719 Ocampo Dr: Home repair or alteration, finishing
- 730-732 Ocampo Dr: New single-family home with an ADU, framing
- 744 Ocampo Dr: Home repair or alteration, finaled
- 750 Ocampo Dr: New single-family home, foundation
- 760 Ocampo Dr: Repair or alteration: revision to an earlier permit, likely complete
- 765 Ocampo Dr: New single-family home, foundation
- 772 Ocampo Dr: New single-family home, likely complete
- 777 Ocampo Dr: New single-family home, framing
All of them: fire rebuilds on Ocampo Dr. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 784 Ocampo Dr, Pacific Palisades?
New single-family home (2 storeys, basement, attached garage, pool or spa, fire sprinklers throughout), permitted October 29, 2025 after the January 2025 Palisades Fire.
What is the status of the rebuild at 784 Ocampo Dr?
It is with the structure going up (Builtie's estimate), read October 20, 2026.
Is 784 Ocampo Dr a like-for-like rebuild?
No. The City marked its permit ineligible for the like-for-like track, so the plans went through standard review.
Who is building 784 Ocampo Dr?
Yaz Construction Inc is named on the permits. The decision makers and contacts are in Builtie.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.