799 Robson Street, Vancouver: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 799 Robson Street, Vancouver was permitted on January 29, 2025 with a stated construction value of $1M to $5M. Field Review - Addition / Alteration - Level 1, 2 & 3 Interior alterations to demo floors 1, 2 & 3 of this Retail tenant at this commercial building on this site. Remove the existing tile and wood flooring inside the CRU space, as well as remove all non… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 799 Robson Street, Vancouver |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | January 29, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Mechanical |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Field Review - Addition / Alteration - Level 1, 2 & 3 Interior alterations to demo floors 1, 2 & 3 of this Retail tenant at this commercial building on this site. Remove the existing tile and wood flooring inside the CRU space, as well as remove all non…”
Which trades are being bought now
The project is with the mechanical, electrical and plumbing rough-in under way. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Vancouver
- 3180 Ash Street: Townhomes
- 3581 Haida Drive: Apartment Building
- 4713 Beatrice Street: Retail Building
- 675 W 10th Avenue: Mixed-Use Building Renovation
- 2691 Horley Street: 4-Storey Townhomes
All of them: construction projects in Vancouver by address. The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 799 Robson Street?
Office and Tenant Fit-Out. Field Review - Addition / Alteration - Level 1, 2 & 3 Interior alterations to demo floors 1, 2 & 3 of this Retail tenant at this commercial building on this site. Remove the existing tile and wood flooring inside the CRU space, as well as remove all non…
When was the permit issued for 799 Robson Street?
January 29, 2025, by the City of Vancouver.
Who is building 799 Robson Street?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 799 Robson Street need now?
At its current stage: site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
