801 Mount Pleasant Rd, Toronto: Apartment Building Renovation

Apartment Building Renovation at 801 Mount Pleasant Rd, Toronto was permitted on February 12, 2026 with a stated construction value of under $1M. Replacement of Riser Isolation valves, Booster Pumps and Installing newDomestic Hot Water Recirc Balancing Valves. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 801 Mount Pleasant Rd, Toronto |
| Neighbourhood | Mount Pleasant East |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | February 12, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Replacement of Riser Isolation valves, Booster Pumps and Installing newDomestic Hot Water Recirc Balancing Valves”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- October 25, 2000Mechanical
- June 25, 2007Fire and life safety: fire protection · under $1M
- December 8, 2017Drains and site services · under $1M
- September 25, 2023Mechanical: roofing
- September 25, 2023Addition or alteration: roofing
- February 12, 2026Plumbing: Apartment Building Renovation · under $1M (this page)
- February 2026Estimated construction start (estimate)
- September 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 170 Roehampton AveNew building · over $250M · July 2026
- 110 Broadway AveNew construction: excavation and shoring · $100M to $250M · February 2026
- 100 Broadway AveNew construction: excavation and shoring · $50M to $100M · February 2026
- 2200 Yonge StAddition or alteration: demolition · $50M to $100M · April 2026
- 2180 Yonge StAddition or alteration: elevator · $25M to $50M · March 2026
13 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Feb 2026 – Sep 2026 | Estimate |
| Fire Protection | Mar 2026 – May 2026 | Window passed (est.) |
| Signage and Wayfinding | May 2026 – Jul 2026 | Window passed (est.) |
| Insulation | Apr 2026 – May 2026 | Window passed (est.) |
| Drywall | Apr 2026 – May 2026 | Window passed (est.) |
| Low Voltage and Data | Apr 2026 – May 2026 | Window passed (est.) |
| Tile | Apr 2026 – Jun 2026 | Window passed (est.) |
| Cabinetry and Millwork | Apr 2026 – May 2026 | Window passed (est.) |
| Flooring | Apr 2026 – Jun 2026 | Window passed (est.) |
| Countertops | Apr 2026 – Jun 2026 | Window passed (est.) |
| Finish Carpentry | Apr 2026 – Jun 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (February 2026) to the estimated completion (September 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 359 Roehampton Ave: Apartment Building Renovation
- 2551 Yonge St: Commercial Project Renovation
- 2525 Yonge St: Office and Tenant Fit-Out
- 299 Roehampton Ave: Apartment Building Renovation
- 134 Banff Rd: 2-Storey Retail Building
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 801 Mount Pleasant Rd?
Apartment Building Renovation. Replacement of Riser Isolation valves, Booster Pumps and Installing newDomestic Hot Water Recirc Balancing Valves
When was the permit issued for 801 Mount Pleasant Rd?
February 12, 2026, by the City of Toronto.
Who is building 801 Mount Pleasant Rd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 801 Mount Pleasant Rd need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.