808 Radcliffe Ave, Pacific Palisades: New building: revision to an earlier permit After the 2025 Fire

New building: revision to an earlier permit at 808 Radcliffe Ave, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on December 5, 2025 with a stated construction value of under $250K, and the rebuild is in the finishing stage (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 808 Radcliffe Ave, Pacific Palisades, Los Angeles, CA |
| City permit address | 808 N Radcliffe Ave |
| Rebuild | New building: revision to an earlier permit |
| What the plans show | pool or spa |
| Rebuild track | Like-for-like rebuild (the City's expedited track under Emergency Executive Order 1) |
| Building permit issued | December 5, 2025 |
| Status | In the finishing stage (Builtie's estimate) |
| Stated construction value | under $250K |
| Builder named on the permits | Suchite J C Construction |
| Permits at this address since the fire | 3 |
The facts above are read from the City of Los Angeles building permits filed for 808 Radcliffe Ave since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| December 5, 2025 | Grading: revision to an earlier permit | Issued |
| December 5, 2025 | New building: revision to an earlier permit | Issued |
| December 16, 2025 | Pool and spa: revision to an earlier permit | Issued |
3 permits since December 5, 2025. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
808 Radcliffe Ave is in the finishing stage (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Signage and Wayfinding | 25% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
| Appliances and Equipment | 65% to 90% |
| Landscaping | 65% to 90% |
Other rebuilds on Radcliffe Ave
- 793 Radcliffe Ave: New accessory dwelling unit (ADU), interior trades
- 800 Radcliffe Ave: New single-family home, finaled
- 805 Radcliffe Ave: New accessory dwelling unit (ADU), likely complete
- 806-808 Radcliffe Ave: New building: revision to an earlier permit, finishing
- 807 Radcliffe Ave: New single-family home, interior trades
- 817 Radcliffe Ave: New single-family home with an ADU, permitted
- 818 Radcliffe Ave: New single-family home, framing
- 824 Radcliffe Ave: New single-family home, framing
All of them: fire rebuilds on Radcliffe Ave. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 808 Radcliffe Ave, Pacific Palisades?
New building: revision to an earlier permit (pool or spa), permitted December 5, 2025 after the January 2025 Palisades Fire.
What is the status of the rebuild at 808 Radcliffe Ave?
It is in the finishing stage (Builtie's estimate), read October 20, 2026.
Is 808 Radcliffe Ave a like-for-like rebuild?
Yes. The City marked its permit eligible for the expedited like-for-like track.
Who is building 808 Radcliffe Ave?
Suchite J C Construction is named on the permits. The decision makers and contacts are in Builtie.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.