82 Montrose Ave, Toronto: Single-Family House Renovation
Follow this project · we email you when its status or build stage changes

Single-Family House Renovation at 82 Montrose Ave, Toronto was permitted on August 24, 2026 with a stated construction value of under $1M. Renovation or addition to a single-family house. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 82 Montrose Ave, Toronto |
| Project | Single-Family House Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | August 24, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Toronto once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- August 24, 2026Small Residential Projects: Single-Family House Renovation · under $1M (this page)
- August 24, 2026Drains and site services: addition
- August 24, 2026Plumbing: addition
- September 2026Estimated construction start (estimate)
- March 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 399 Bathurst StAddition or alteration: excavation and shoring · $10M to $25M · November 2025
- 155 Strachan AveNew building · $1M to $5M · November 2025
- 180 Shaw StAddition or alteration: roofing · $1M to $5M · February 2026
- 377 Manning AveNew building · $1M to $5M · August 2026
- 360 Montrose AveNew construction: demolition · $1M to $5M · August 2026
11 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 7 to approach now, 2 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Sep 2026 – Mar 2027 | Estimate |
| Excavation and Site Work | Aug 2026 – Sep 2026 | Window passed (est.) |
| Construction Site Security | Aug 2026 – Oct 2026 | Approach now |
| Concrete and Foundation | Aug 2026 – Sep 2026 | Window passed (est.) |
| Structural Steel | Sep 2026 – Oct 2026 | Approach now |
| Elevators | Sep 2026 – Oct 2026 | Approach now |
| Framing | Sep 2026 – Oct 2026 | Approach now |
| Painting | Sep 2026 – Nov 2026 | Approach now |
| Masonry | Sep 2026 – Oct 2026 | Approach now |
| Waterproofing | Sep 2026 – Oct 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in Toronto
Leads for your trade: Construction Site Security leads in Toronto · Structural Steel leads in Toronto · Elevators leads in Toronto · Framing leads in Toronto · every trade in Toronto.
More projects: every Toronto project of $1M+ by address · major projects in Toronto.
Compare tools: The Best Construction Lead Generation Software in Ontario.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 3908 Bloor St W: Office and Tenant Fit-Out
- 2322 Bloor St W: Office and Tenant Fit-Out
- 5633-5639 Finch Ave E: Institutional Project Renovation
- 125 Chatsworth Dr: School Renovation
- 1451 Bathurst St: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 82 Montrose Ave?
Single-Family House Renovation. Renovation or addition to a single-family house.
When was the permit issued for 82 Montrose Ave?
August 24, 2026, by the City of Toronto.
Who is building 82 Montrose Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 82 Montrose Ave need now?
Estimated as of October 2026, the trades to approach now are site security, structural steel, elevator, framing, painting, masonry and waterproofing. Already passed: excavation and site work; concrete.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.