842 The Queensway, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 842 The Queensway, Toronto was permitted on November 19, 2025 with a stated construction value of under $1M. Proposal to construct a rear addiition, basement underpinning and new basement walkout to existing building. Interior alterations are also proposed to all floors, basement/ground floor to be used for Nail Salon, second storey residential unit to be enlarged. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 842 The Queensway, Toronto |
| Neighbourhood | Stonegate-Queensway |
| Project | Office and Tenant Fit-Out |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | November 19, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Framing |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal to construct a rear addiition, basement underpinning and new basement walkout to existing building. Interior alterations are also proposed to all floors, basement/ground floor to be used for Nail Salon, second storey residential unit to be enlarged”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- November 19, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- December 15, 2025Mechanical: excavation and shoring
- December 17, 2025Drains and site services: excavation and shoring
- December 18, 2025Plumbing: excavation and shoring
- December 2025Estimated construction start (estimate)
- June 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 1156 The QueenswayNew construction: excavation and shoring · $100M to $250M · December 2025
- 1053 The QueenswayNew construction: foundation · $5M to $10M · November 2025
- 20 Queen Elizabeth BlvdNew building · $1M to $5M · December 2025
- 1001 The QueenswayAddition or alteration: interior alteration · $1M to $5M · November 2025
- 45 Stanmills RdNew building · $1M to $5M · May 2026
10 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Dec 2025 – Jun 2026 | Estimate |
| Construction Site Security | Dec 2025 – Jan 2026 | Window passed (est.) |
| Painting | Dec 2025 – Feb 2026 | Window passed (est.) |
| Masonry | Dec 2025 – Jan 2026 | Window passed (est.) |
| Waterproofing | Dec 2025 – Jan 2026 | Window passed (est.) |
| Roofing | Jan 2026 – Feb 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Dec 2025 – Feb 2026 | Window passed (est.) |
| Electrical | Jan 2026 – Feb 2026 | Window passed (est.) |
| HVAC and Mechanical | Jan 2026 – Feb 2026 | Window passed (est.) |
| Plumbing | Jan 2026 – Feb 2026 | Window passed (est.) |
| Fire Protection | Jan 2026 – Feb 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (December 2025) to the estimated completion (June 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 177 Stephen Dr: Apartment Building Renovation
- 689 The Queensway: Office and Tenant Fit-Out
- 745 The Queensway: Office and Tenant Fit-Out
- 853-855 The Queensway: Restaurant Renovation
- 81 Edgecroft Rd: Retail Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 842 The Queensway?
Office and Tenant Fit-Out. Proposal to construct a rear addiition, basement underpinning and new basement walkout to existing building. Interior alterations are also proposed to all floors, basement/ground floor to be used for Nail Salon, second storey residential unit to be enlarged
When was the permit issued for 842 The Queensway?
November 19, 2025, by the City of Toronto.
Who is building 842 The Queensway?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 842 The Queensway need now?
Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.